BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work for a water / sewer project in San Diego, California. Working plans call for site work for a water / sewer project.

Demolition and abandonment of service connections at Rainbow 11 and Rainbow 12 Flow Control Facilities. Work includes, but is not limited to, excavation, shoring and sheeting, welding of blind flanges, demolition of existing steel pipes, removal and salvage of existing valves and appurtenances, removal of existing structure at pipe penetrations, reconstruction of structure penetrations after pipe removal, abandonment of 16- to 24-inch diameter piping, and encasement of abandoned pipe ends.

Final Planning

Water / Sewer

$7,340,289.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
109
Bidding Soon
1,391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

To Be Determined, San Diego, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.