Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Site work for a water / sewer project in Bellevue, Washington. Completed plans call for site work for a one-story above grade water / sewer project.

LOCATION Right of Way of NE 40th Street adjacent to 14080 NE 40th Street, Bellevue WA 98007 Work contemplated to be performed under this contract includes constructing approximately 40 linear feet of 18-inch ductile iron watermain, installing a new 18-inch butterfly valve, abandoning an existing water meter and 96-inch manhole, connecting to existing watermain, performing asphalt trench patching, Providing traffic control and other work required to complete the project. Each bid must be accompanied by a bid bond in the form of cash, certified check, cashier's check, or surety bond in an amount equal to at least 5% of the bid. The successful bidder must also comply with supplemental responsible bidder criteria and the City of Bellevue's equal opportunity requirements. All plans and specifications for this project are available online at the Builder's Exchange of Washington website. Any omissions, discrepancies or need for interpretation should be brought in writing to the attention ofthe Engineer not later than 4 days prior to bid opening, or 2 days prior for a 2 week bid period. Written addenda to clarify questions which arise may then be issued Long lead time equipment shall be procured by the Contractor following contract award. Once the equipment order is placed, the project will be suspended until critical items are received to begin construction. Long Lead equipment must be ordered within 21 days from the Notice to Proceed. The Contractor shall store all equipment in a secure location until the City provides written authorization for Construction to resume. The following list provides the long lead time equipment and lead time expected under the Contractor's Scope ofWork: All interpretation or explanations ofthe Contract Documents shall be in the form of an addendum and no oral statements by the Owner, Engineer, or other representative ofthe Owner shall, in any way, modify the Contract Documents, whether made before or after letting the Contract. - Restrained joint ductile iron pipe, IS" diameter; 3 weeks - Couplings and Fittings, IS" diameter; 3 weeks - Butterfly valve, IS" diameter; 3 weeks Contract calendar days given under Form IX Proposal/Construction Contract do not include the suspension time.

Bid Results

Water / Sewer

$153,506.00

Public - City

Site Work

5

17

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
105
Bidding Soon
1,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

14080 NE 40th St, Bellevue, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.