BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 18, 2025

Site work for a water / sewer project in Reno, Nevada. Completed plans call for site work for a water / sewer project.

Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the replacement of approximately 1000 LF of 6" steel main with 8" ductile iron main on Turbine Way between Surge St and Aquifer Way. 1. Main Replacement: a. Installation of approximately 950LF 8” restrained ductile iron pipe and associated fittings. b. Installation of approximately 20LF 6” restrained ductile iron pipe and associated fittings. c. Grout fill and abandonment of approximately 950LF 6” steel pipe and associated fittings. d. Retirement offive (5) existing 1” HDPE/POLY service laterals and replacement with HDPE service tubing from main to setter. e. Abandon and grout fill existing 6” diameter steel water main, fittings, valves, and associated appurtenances. f. Saw Cutting, temporary pavement patching, placement and compaction of bedding sand and backfill materials, permanent pavement patching, 2- inch mill and overlay, slurry seal, and traffic control associated with the installation ofthe proposed pipelines and services. Question Deadline 01/05/2026 at 2:00 PM PT Questions regarding this solicitation must be submitted through the Questions Tab no later than three (3) business days before the Bid Opening. 1/6/2026 02:00:00 PM (PT) Answers Due Date. All questions submitted prior to the Question cut-off will be answered no later than two (2) business days before the Bid Opening. All content viewed and/or downloaded is considered confidential information and shall be used by the Recipient solely for the purpose of evaluating and potentially submitting a bid for the Project, and not in any way detrimental to TMWA. Recipient shall not copy or otherwise reproduce any confidential information and may not distribute any information to any third-party that is not necessary for purposes of evaluating and submitting a bid for the Project. The Engineer's estimate is: $542,268 - $662,772 This Project is deemed a Horizontal Construction Project. Contact Information *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Water / Sewer

$662,772.00

Public - County

Site Work

15

17

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
14
Bidding Soon
432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 2, 2026

Project location map

Turbine Way, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.