BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Renovation of an educational facility in Naperville, Illinois. Completed plans call for the renovation of a one-story above grade educational facility.

Electronic bids will be received for the 2026 Roof Work at Jefferson Jr. High School, Naperville, Illinois, for Naperville Community Unit School District 203. The work must be performed in accordance with the proposed Contract Documents prepared by Healy Bender Patton & Been Architects. Bids are to be submitted electronically via Bidnet.com. Prospective bidders are required to register as a vendor, complete a Registered Plan Holder Record form and a Bidding Documents License Agreement before receiving bidding documents. Bids will be received for General Contract Work, including all trades. Bidders must satisfactorily complete the Bidder Responsibility process described in Section 01 00 00 - Bidder Responsibility Criteria of the Project Manual by providing required documents with their sealed bids. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check, or Bank Draft, in an amount equal to not less than ten percent (10%) of the bid, payable to the Board of Education. The successful bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract. The Owner reserves the right to reject any or all bids and to waive any informalities in bidding. Work covers complete construction and installation of work specified and/or required, including all trades for the 2026 Roofing Work, Jefferson Jr. High School, Naperville, Illinois for Naperville Community Unit School District 203, Naperville, DuPage County, Illinois, hereinafter called the Owner and is to be constructed in accordance with the Contract Documents prepared by Healy Bender Patton & Been Architects, 4040 Helene Avenue, Naperville, Illinois, the Architect. B. Products shall be installed in strict accordance with manufacturer recommendations. The Contractor shall review substrates prior to installing products. Installation of products shall represent that the Contractor has accepted the substrates as proper for the installation of products. Substrates which are not acceptable shall be corrected prior to the installation of products.

Award

Educational

$858,077.00

Public - City

Renovation

9

11

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
3
Bidding Soon
2,193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

May 26, 2026

Project location map

1525 Loomis St, Naperville, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.