BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated January 8, 2026

Site work, paving and new construction of a mixed-use development in Altoona, Iowa. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Scope Package No. 01-1 - Concrete & Exposed Piping Work: Generally, includes construction of cast-in-place concrete structures (footings, walls, slab-on-grade, elevated decks, etc.) and supply and installation of exposed process piping systems Scope Package No. 03-1 - Precast Concrete Supply: Generally, includes supply of precast concrete wall panels. Scope Package No. 05-1 - Structural Steel Supply: Generally, includes supply of structural steel such as columns, beams, joist, and decking. Scope Package No. 05-2 - Precast Concrete & Structural Steel Work: Generally, includes installation of precast concrete supplied by 03-1 and structural steel supplied by 05-1. Scope Package No. 07-1 - Membrane Roofing Work: Generally, includes supply and installation of membrane roofing systems Scope Package No. 08-1 - Aluminum Framed Openings and Glazing Work: Generally, includes supply and installation of aluminum curtain walls, aluminum framed storefronts, and glazing Scope Package No. 08-2 - Translucent Panel Assemblies Work: Generally, includes supply and installation of translucent panel assemblies Scope Package No. 09-1 - Painting and High-Performance Coatings Work: Generally, includes supply and installation of interior and exterior paints, stains, and high-performance coatings. Scope Package No. 11-1 - Aerator, Filters, Softeners, & Blower Supply: Generally, includes supply of induced draft aerator, pressure filters, air wash blowers, ion exchange water softeners, and brine pumps Scope Package No. 11-2 - Low and High Service Pumps Supply: Generally, includes supply of low service vertical turbine pumps and high service horizontal split case pumps. Scope Package No. 11-3 - Brine Storage Supply: Generally, includes supply of fiberglass reinforced plastic brine storage tanks and accessories. Scope Package No. 22-1 - Plumbing & HVAC Work: Generally, includes supply and installation of plumbing and HVAC systems such as domestic water, sanitary sewer, roof drainage, heating, cooling, ventilation, and dehumidification. o Scope Package No. 26-1 - Electrical & SCADA Controls Work: Generally, includes supply and installation of electrical systems, backup power generation, and SCADA systems. o Scope Package No. 32-1 - PCC Paving Work: Generally, includes supply and installation of concrete site paving and sidewalks. o Scope Package No. 33-1 - Well #6 Drilling and Test Pumping Work: Generally, includes the drilling and development a Jordan Aquifer well that will be approximately 2,530 foot deep. o Scope Package No. 33-2 - Well #5 and #6 Pitless Units & Wel Pumps Work: Generally, includes supply and installation of pitless units and well pumps at both Wells #5 and #6. o Scope Package No. 33-3 - Ground Storage Reservoir Work: Generally, includes construction of a 1,500,000-gallon wire-wound prestressed concrete ground storage reservoir, including installation of a ground improvement system Earthwork starting March 2026; earth fill settlement period May 2026 through July 2026; concrete foundations starting after settlement period; building enclosure by May 2027; potable water to the distribution system December 2027. Question Deadline 12/30/2025 at 5:00 PM CT Requests for Clarifications and Questions: Please submit all questions directly to Story Construction at estimating@storycon.com or keith.searcy@storycon.com.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
0
Bidding Soon
472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

March 2, 2026

Project location map

5739 NE 80th St, Altoona, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.