BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2026 at 7:00 PM

Updated January 11, 2026

Site work for a water / sewer project in Melrose Park, Illinois. Completed plans call for site work for a water / sewer project.

The proposed work is officially known as Lead Service Line Replacement Phase 1 and further described the removal and replacement of lead water services from the main to the meter, all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). Site Directions: Project location is on Emerson Street south of Fullerton Avenue, to the south of Fullerton Avenue approximately 1/4 mile west of the intersection of 25th Ave at Fullerton Ave. The proposed work is officially known as "Lead Service Line Replacement Phase 1" and further described the removal and replacement of lead water services from the main to the meter, all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). This item of work shall include furnishing, installing, maintaining, replacing, relocating and removing all traffic control devices used for the purpose of regulating, warning or directing traffic during the construction or maintenance of this improvement. Traffic Control and Protection shall be provided as called for in the Plans, these Special Provisions, applicable Highway Standards, applicable sections of the STANDARD SPECIFICATIONS, or as directed by the ENGINEER. The CONTRACTOR is required to conduct routine inspections of the work site at a frequency that will allow for the timely replacement of any traffic control device that has become displaced, worn or damaged to the extent that it no longer conforms to the shape, dimensions, color and operational requirements of the MUTCD, the Traffic Control Standards or will no longer present a neat appearance to motorists. A sufficient quantity of replacement devices, based on vulnerability to damage, shall be readily available to meet this requirement. Phase 1 Lead Service Line Replacement Emerson Ave Address Near or Far Side (N/F) 1 2302 Emerson Av N 2 2303 Emerson Av F 3 2309 Emerson Av F 4 2310 Emerson Av N 5 2314 Emerson Av N 6 2320 Emerson Av N 7 2321 Emerson Av F 8 2326 Emerson Av N 9 2327 Emerson Av F 10 2332 Emerson Av N 11 2333 Emerson Av F 12 2339 Emerson Av F 13 2351 Emerson Av F CONTRACTOR is reminded that time is of the essence for the contract and all work including restoration must be completed, inspected and approved prior to May 15, 2026.

GC Bidding

Water / Sewer

$175,000.00

Public - City

Site Work

22

5

2

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
316
Bidding Soon
3,359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 20, 2026

Project location map

Fullerton Ave, Melrose Park, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.