Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2025 at 7:00 PM
Updated April 1, 2026
This is a service / maintenance or supply contract in Edgerton, Wisconsin. Contact the soliciting agency for additional information.
Rock River and Lake Kosh konong Buoy Installation and Removal The placement and removal of the navigational, slow-no-wake and hazard buoys for the 2026 & 2027 seasons is available for bid. The contractor, if awarded the bid will be responsible for 2 yrs of service. 1. Place and remove up to (47) navigational, slow-no-wake and hazard buoys on the Rock River and Lake Kosh konong from the Indian ford Dam to north of Falk Rd in Jefferson County. Please reference the map provided. 2. Buoy placement and identification will be provided via GPS coordinates, a map and a numbering system. Buoys will be physically numbered according to placement and GPS coordinates. 3. Placement of buoys shall be completed by May 1st of the year of contract provided the water level is at or below 778 ft as recorded at gauge #05427235 at Lake Koshkonong near Newville. Installation of buoys will be completed seven (7) days prior to the Saturday of Memorial Day weekend, regardless of water depth. 4. Removal of buoys shall be completed no earlier than October 15th and no later than October 30th. Removal of buoys is not subject to water level restrictions. 5. Off-season storage of the buoys will be at the Department of Natural Resources Station at Newville or another suitable location to be determined. 6. Contractor will provide proof of insurance with bid submission for a minimum of $1M and provide indemnification for Rock Koshkonong Lake District. 7. Contractor will possess all equipment necessary for the proper removal, installation, and handling of buoys. 8. Contractor will inspect buoys and report any necessary maintenance or repairs to the RKLD at the time of installation and/or removal. 9. Any repairs or maintenance can be quoted to RKLD, and if awarded, needs to be completed in a timely manner.10. Payment for the installation and/or removal will be made within 30 days after approval by the Board of Commissioners. 11. RKLD reserves the right to modify the installation and removal dates as weather and water levels fluctuate. Any deviation from the installation and removal dates must be approved by the RKLD Board of Commissioners. 12. Note: Buoy, tether, and anchor combined may weigh up to 200 lbs. If you have any questions regarding the bid request, please contact Secretary Richardson at (608) 751-0732.
Post-Bid
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
April 30, 2026
Multiple Locations, Edgerton, WI
Related To This Project
Edgerton, WI
Bid Date: Feb 11 2026
Edgerton, WI
Bid Date: Mar 05 2026
Edgerton, WI
Bid Date: Mar 10 2026
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Aug 07 2025
Edgerton, WI
Bid Date: Jun 30 2025
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
Bid Date: Jun 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
