Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 24, 2025 at 8:00 PM
Updated October 25, 2025
Site work and paving for a road / highway in Edgerton, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Solicitation Id: SW-08 The pavement needs to be replaced. Rehabilitation project to replace the pavement of approximately 2.6 miles of WIS 59 from E Mallwood Drive to County N in the Towns of Fulton and Milton in Rock County. Replace the pavement on WIS 59 from E Mallwood Drive to the Rock River; Install roundabouts on WIS 59 at the intersections of E Mallwood Drive, Ellendale Road, and County N; Remove the N Hillside Drive access to WIS 59 by constructing it into a cul-de-sac; Reconstruct WIS 59 and abutting intersections from the Rock River to County N; Improve drainage along the corridor along with the addition of storm sewer near the new roundabouts; Right-in/right-out access at E Harbor Road (east), left-out access restriction at N Clear Lake Road; Realignment of E Vincent Road (east) and other associated improvements. Anticipated Construction Cost: $13,000,000-$13,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 11/01/2025 Anticipated Project Completion Date: 05/01/2028 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Edgerton - Whitewater - STH 59E *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$13,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2025
WI-59, Edgerton, WI
Related To This Project
Edgerton, WI
--
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Aug 07 2025
Edgerton, WI
Bid Date: Jun 30 2025
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
Bid Date: Jun 03 2025
Edgerton, WI
Bid Date: Apr 10 2025
Edgerton, WI
Bid Date: Mar 07 2025
Edgerton, WI
--
Edgerton, WI
Bid Date: Dec 19 2024
Edgerton, WI
Bid Date: Dec 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
