Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 2, 2025 at 8:00 PM
Updated October 3, 2025
Renovation of a municipal facility in Edgerton, Wisconsin. Completed plans call for the renovation of a municipal facility.
The City of Edgerton, Wis., is soliciting bids from Contractors interested in removing and replacing 21 shingled roofs and 1 shake roof. Interested Contractors shall provide the city with a bid and information regarding the firm's experience,references, and proposed schedule using the fully executed Bid Form. Interested parties should contact: City of Edgerton 12 Albion St Edgerton, Wis., 53534Call 608-884-3341 or email znelson@edgerton.wi.gov The City of Edgerton re-serves the right to contract with the Bidder that has been determined to be in the best interest of the City after full consideration of cost, schedule and overall value. The City of Edgerton also reserves the right to reject any or all Bids and the right to adjust the schedule.. Racetrack Park 900 Stoughton Rd WWTP, 500 Highway St. Edgerton Pool, 312 N Main St. DPW Garage and salt shed, 315 W High St Fassett Cemetery House, 2005 S Main St The City of Edgerton is soliciting bids from Contractors interested in removing and replacing 21 shingled roofs and 1 shake roof. Contractor shall provide all labor, materials, and equipment to complete all work. Removal and proper disposal of existing roofing materials. Thorough inspection of the roof deck and structural components to identify and make all necessary repairs. Advising client on material recommendations and options. Shingles must be at minimum 30-year architectural laminate shingles manufactured by GAF, Owen Corning, CertainTeed or equivalent. Shingles should be color matched as close as possible to the existing shingles. Replace well house #4 cedar shake roofing with cedar shakes. Installation of new roofing materials that meet building codes and standards. The new roof should include appropriate underlayment, drip edge, ice and water barrier, flashing, venting, and weatherproofing. Complete cleanup of the job site, ensuring all debris and materials are removed and the site is left in good condition.
Award
Municipal
$138,500.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
October 13, 2025
Multiple Locations, Edgerton, WI
Related To This Project
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
Bid Date: Sep 11 2025
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
Bid Date: Aug 07 2025
Edgerton, WI
Bid Date: Jun 30 2025
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
--
Edgerton, WI
Bid Date: Jun 03 2025
Edgerton, WI
Bid Date: Apr 10 2025
Edgerton, WI
Bid Date: Mar 07 2025
Edgerton, WI
--
Edgerton, WI
Bid Date: Dec 19 2024
Edgerton, WI
Bid Date: Dec 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
