BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work and renovation of a civil project in Edgerton, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The City of Edgerton Sewer Utility is requesting sealed bid proposals for the replacement of the one aeration blower along with air piping replacements at the City's Wastewater Treatment Facility (WWTF). The project includes the following scope of supply: The existing aeration blower No. 1 is to be removed and provided to the OWNER for their storage/use as they select/determine. This includes the control panel and related electrical connections. All control and electrical connections are to be terminated to allow future new connections to the new Aerzen aeration blower equipment. Installation of one new Aerzen hybrid blower and associated equipment is to follow the removal of the existing equipment. Approved shop drawings for the new equipment are available upon request for determining the required work scope. The concrete pad for the blower also needs to be widened. Following the installation of the new Aerzen aeration blower and associated equipment, the City/Other Contractors will complete the electrical/instrumentation/control upgrades for the project to attain operational level for the new equipment. Start-up operation of the new equipment is to be completed onsite with Aerzen representatives, electrical/control representatives and the CONTRACTOR representatives. Any adjustments/corrections/modifications are to be completed by the CONTRACTOR at this time. It is expected that this work is to be completed no later than December 19, 2025. Additional work scope with this blower replacement is the installation of approximately 120 LF of 10" 304 SS Schedule 10 above grade air piping from the new Aerzen blower to the existing aeration basins. The city has purchased new Aerzen blower equipment and is expecting delivery to the WWTF by October 31, 2025. The bid proposals shall be accompanied by a certified check payable to the City of Edgerton equal to 5% of the proposal or a bid bond of a bonding company authorized to do business in the State of Wisconsin in an amount equal to 5% of the proposal. Proposals shall not be withdrawn for a period of 30 days after the date of opening. The City of Edgerton reserves the right to reject any or all of the proposals and to waive any information therein.

Award

Water / Sewer

$95,550.00

Public - City

Renovation, Site Work

11

5

18

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
282
Bidding Soon
3,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

October 30, 2025

Project location map

500 Hwy St, Edgerton, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.