BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2025 at 7:00 PM

Updated December 27, 2025

Site work and paving for a civil project in Saint Charles, Missouri. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Proposed Improvement: 1. New roundabout and full depth pavement, new shared use path 2. New SUP connections across First Capitol Drive with a prefabricated steel bridge 3. New roundabout with full depth pavement, pavement rehabilitation, new shared use path, median barrier, advanced detection Location: 1. First Capitol & Kingshighway Roundabout. (CMAQ-7302(721)) 2. First Capitol Shared Use Path Bridge (TAP-7302(722)) 3. First Capitol West Clay to Kingshighway Length: First Capitol Roundabout - .2 miles First Capitol SUP Bridge. - .1 miles First Capitol West Clay to Kingshighway - .5 miles Consultant Services Required: The engineering responsibilities may include but are not limited to the following: The preparation of Conceptual plans, Preliminary plans, Contract plans. Design services may include, right of way plans, surveying, subsurface utility investigation, title research, geotechnical investigations, roadway plans, retaining wall plans, striping plans, public involvement, environmental and historic preservation services/permits, archeological surveys, contract documents, assisting with the bidding process, construction support/construction inspection, utility coordination/permits and traffic control plans including the preparation of PS&E and final documents, project administration and management. The method of Contractor Selection has not been Determined at this time. MODOT - RFQ Engineering - Improvements Include a New Roundabout at First Capitol Drive and Kingshighway Street To Replace the Existing Signalized Intersection

Conceptual

Roads / Highways

$10,880,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
0
Bidding Soon
843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2026

Project location map

1st Capitol Dr, Saint Charles, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.