BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated March 19, 2026

Site work for a power facility in Naples, Florida. Completed plans call for site work for a power facility.

All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the Lee County Electrical Cooperative Staff or Officials Other Than the Specified Contact Person. M/wbe's Are Encouraged to Participate in the Bid Process. Scope of Work General: 1. Prior to construction, the Landscape Contractor is responsible for contacting Sunshine One (call 811, or Toll Free 800-432-4770), Locating all underground utilities and shall avoid damage to all utilities during construction. Should the Landscape Contractor cause damage to any utilities, necessary repairs should be made as quickly as practicable at the Landscape Contractors expense. 2. The Contractor is responsible for obtaining all necessary permits not provided by LCEC prior to commencing any work. 4. The Contractor is responsible for keeping a full signed and sealed plan set on site at all times. The Contractor shall maintain a redlined copy of all field adjustments made and provide a copy of the redlined plans to the Landscape Architect for preparing the as-built plans at the completion of the job. 5. The construction bid pricesfor itemsthat require demolition and/or removal of existing materials shall include the cost of demolition and proper disposal of the exiting materials, such plantings, asphalt, limestone, fill dirt, and concrete. 6. The Contractor is responsible for maintaining, in full all planting areas (including watering, spraying, mulching, mowing, fertilizing, etc.) until the job is accepted by LCEC, Landscape Architect and County permitting/development departments. 7. All plant material shall be of Florida #1 of better quality at time of installation and shall be maintained in this same condition until final acceptance. Decline in condition of plant material during the maintenance period shall be grounds for rejection and replacement. 8. Samples of all plant and hardscape material to be submitted for LCEC and/or Landscape Architect approval prior to installation.

Post-Bid

Power Plant

$200,000.00

Public - County

Site Work

4

4

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
2
Bidding Soon
553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2026

February 25, 2026

Project location map

4880 Everglades Blvd N, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.