Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 7, 2026 at 7:00 PM

Updated January 13, 2026

Renovation of a transportation facility in East Alton, Illinois. Completed plans call for the renovation of a transportation facility.

Reference Number 0000407640 Description St. Louis Regional Airport Authority "Authority" is soliciting proposals from qualified Contractors to remove and replace an existing standby airfield generator. The new generator will provide reliable emergency power to airfield components that support aircraft operations during interruptions to normal power supply. All questions can be directed to Drake Blackwell, Assistant Airport Director, at the contact information below Attn: Assistant Airport Director 618-259-2531 dblackwell@stlouisregional.com General Requirements - Insurance Required - Prevailing Wage Required Award Requirements - All or None Award The Authority reserves the right to accept or reject all proposals submitted and to waive any and/or all irregularities pertaining to the submission of proposals. Prevailing wage must be included in any proposal provided along with itemized breakdown of services. The selected Contractor must be licensed to perform this work

Post-Bid

Transportation Terminals

$300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
150
Bidding Soon
1,724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

February 11, 2026

Project location map

8 Terminal Dr, East Alton, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed