Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 24, 2026 at 7:00 PM
Updated January 25, 2026
Renovation of a fire / police facility in Lompoc, California. Completed plans call for the renovation of a fire / police facility.
The Lompoc City Fire Department plans to replace all flooring at Station 51, including the upstairs living area, kitchen, hallways, and dormitories. Currently, the flooring is a mix of carpet and vinyl in the kitchen. The department has decided to install a single type of laminate flooring across the entire upstairs area to create uniformity and enhance both appearance and functionality. Because the flooring has not been replaced in some time, the flooring contractor will need to evaluate all underlayment and subfloor requirements. They will also assess transitions between rooms. The department has chosen the flooring and baseboards for the project (see attachments). The Lompoc Fire Department seeks a contractor capable of completing the work quickly, as firefighters live and work at the station 24/7. Question Deadline 01/20/2026 at 4:00 PM PT Fax or email inquiries to purchasing@ci.lompoc.ca.us Questions may be submitted, by written request through the online Portal, for an interpretation or correction thereof. Fax or email inquiries to: Theresa Hernandez, Buyer, (805) 735-7628, t_hernandez@ci.lompoc.ca.us. Project Overview Remove existing floor finishes and install new resilient plank flooring and rubber base in all designated upstairs areas (Rooms 1-10 per Attachment A) and in the downstairs training room and captain's office. Restrooms are excluded from flooring replacement; provide clean, code-compliant transitions at restroom thresholds. Remove existing stair treads and risers. Install new commercial-grade rubber stair treads and risers. 3. Project Objectives o Provide durable, low-maintenance flooring suited to high-use firehouse operations. o Enhance the flooring space to support modern firehouse operations. o Improve comfort, hygiene, and professional appearance. o Refresh the interior spaces to showcase community pride and professionalism. o Execute work without impairing emergency response or egress. All bids shall be accompanied by cash, a money order, or a cashier's certified check, payable to the order of the City, amounting to ten percent (10%) of the bid, or by a bond in said amount and payable to said City, signed by the bidder and a corporate surety, or by the bidder and two sureties who shall justify before any officer competent to administer oaths, in double said amount over and above all statutory exemption. Performance Bond: Successful bidder shall furnish within eight (8) consecutive calendar days after written Notice of Award, a Performance Bond in an amount equal to one hundred percent (100%) of the total amount of the contract. In the event the bidder to whom an award is made fails or refuses to perform under or to execute the contract, if required, within eight (8) calendar days from the date of receiving notification of award, the City may declare the bidder's bid deposit or bond forfeited as damages caused by the failure of the bidder to enter into the contract, and may award to the next lowest bidder, or may call for new bids. Labor and Materials Bond: Successful bidder shall furnish within eight (8) consecutive calendar days after written Notice of Award, a Labor and Materials Bond in an amount equal to one hundred percent (100%) of the total amount of the contract. The existing wall base shall be replaced with new 6-inch rubber base as specified (FLEXCO Base Sculptures, SOW 7.6). The contractor is responsible for patching and preparing wall surfaces where base is removed so the substrate is smooth, plumb, and paint-ready. All work must preserve egress and comply with Cal/OSHA housekeeping requirements A. Improve comfort, hygiene, and professional appearance. B. Execute work without impairing emergency response or eg Remove existing floor finishes and install new resilient plank flooring and rubber base in all designated upstairs areas (Rooms 1-10 per Attachment A) and in the downstairs training room and captain's office. Restrooms are excluded from flooring replacement; provide clean, code-compliant transitions at restroom thresholds
Post-Bid
Fire / Police
$20,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2026
February 23, 2026
115 S G St, Lompoc, CA
Related To This Project
Lompoc, CA
Bid Date: Feb 09 2026
Lompoc, CA
Bid Date: Feb 09 2026
Lompoc, CA
Bid Date: Feb 17 2026
Lompoc, CA
Bid Date: Feb 17 2026
Lompoc, CA
Bid Date: Feb 17 2026
Lompoc, CA
Bid Date: Feb 17 2026
Lompoc, CA
Bid Date: Feb 17 2026
Lompoc, CA
Bid Date: Feb 17 2026
Lompoc, CA
Bid Date: Feb 12 2026
Lompoc, CA
Bid Date: Dec 30 2025
Lompoc, CA
Bid Date: Jan 30 2026
Lompoc, CA
Bid Date: Dec 02 2025
Lompoc, CA
Bid Date: Dec 31 2025
Lompoc, CA
Bid Date: Dec 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
