Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work for a bridge / tunnel in Stockton, New Jersey. Completed plans call for site work for a bridge / tunnel.

As of March 11, 2026, this project has not yet been awarded. The project is expected to be awarded by the Authority Board in May. Sealed bids are invited for the rehabilitation of the Prallsville Culvert Pit and miscellaneous components at Prallsville Mills - Delaware & Raritan Canal, 33 Risler St, Stockton Borough, Hunterdon County, New Jersey. All bids must include a bid security of at least 10% of the total bid price or $20,000, whichever is less. The project is classified as a Public Work and is subject to the NJ Prevailing Wage Act and the NJ Public Works Contractor Registration Act. A contract goal is set for 25% participation by New Jersey-based Division of Revenue-registered small businesses, and contractors are also required to make a good faith effort to include 3% participation by eligible disabled veteran businesses. Compliance is required with the State of New Jersey Business Registration Certification Act, Affirmative Action Compliance requirements, the Diane B. Allen Equal Pay Act, the Small/Disabled Veteran Business Set Aside Act, and Pay to Play Prohibitions and Political Contribution Disclosure requirements. Question Deadline 01/31/2026 All questions about the meaning or intent of the Invitation for Bids shall be submitted to the Authority in writing to: Stephen Gates, P.E., Chief Engineer New Jersey Water Supply Authority PO Box 5196 Clinton, NJ 08809 Email: sgates@njwsa.org This Invitation for Bids (IFB) is being released by the New Jersey Water Supply Authority, hereinafter referred to as the "Authority," to obtain bids for the rehabilitation of the Prallsville Culvert Pit and Prallsville Spillway which were damaged by remnants of Hurricane Ida in 2021. The open pit connects two existing masonry culverts and has partially collapsed. The spillway has four nonoperational sluice gates and a damaged stone abutment. The project proposes to utilize concrete box culverts to connect the existing culverts within the pit and fill to grade. The sluice gates will be removed and the erosion at the abutment will be repaired in kind. The work required includes the provision of all labor, materials, equipment, and services necessary as required by the contract documents.

Bid Results

Bridges / Tunnels

$771,150.00

Public - State/Provincial

Site Work

18

9

8

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
9
Bidding Soon
3,771
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

March 12, 2026

Project location map

33 Risler St, Stockton, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.