BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work for a water / sewer project in Bothell, Washington. Completed plans call for site work for a water / sewer project.

Question Deadline 01/23/2026 at 5:00 PM PT All questions regarding this solicitation shall be submitted in writing to the District's Project Representative David MacDonald, 3626 156th Street SW, Lynnwood, Washington 98087 phone number 425-741-7964 or email at dmacdonald@awwd.com. This contract provides for improvements and restoration of Queensborough Creek at various locations along a 0.5 mile segment of the creek, and rehabilitation and repair of the sewer infrastructure located along the creek. The sewer pipe and manhole structures within the project area have been subject to stream erosion and have become exposed in places. The work area is heavily wooded and vegetated, located in a ravine with steep slopes, and access is limited. All work located below the Ordinary High Water Mark must be completed while the stream is dry or in a low-flow period, or within the permit approved fish window. Major elements of the work include installation and management of temporary erosion and sedimentation control measures, temporary construction access planning and improvements, installation of approximately 2,800 linear feet of 12-inch diameter sewer lining, sewer and stream bypassing, manhole structure modifications, repairs, removals, and interior lining, storage and repurposing of felled trees for creek restoration, installation of creek repair and restoration improvements, permanent access path construction and final grading, installation of permanent retaining walls, wetland and natural habitat restoration, and stream buffer riparian habitat restoration. Subcontracting opportunities may include surveying, earthwork, dewatering, cured-in-place-pipe, and landscaping restoration. Instructions for bidders include requirements for bid submission, bid guaranty, and procedures for accessing bid documents and addendums. There is a mandatory apprentice utilization requirement of 15% of the total labor hours. The District reserves the right to reject any bid, portion of any bid, or all bids, and may waive informalities and irregularities.

Bid Results

Water / Sewer

$3,064,923.00

Public - County

Site Work

40

7

4

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
149
Bidding Soon
1,460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

April 6, 2026

Project location map

Multiple Locations, Bothell, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.