BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Renovation of a detention facility in Lakewood, Colorado. Completed plans call for the renovation of a detention facility.

Title: Replace HVAC Systems NCD, DYS, CALM Ph 1&2. Estimated Project Cost: $5,000,000. Solicitation No: 2026000110, 2024-047M23. Request for Clarifications Due January 29, 2026 Award Intent Notification (anticipated) February 20, 2026 Contracting February 20 – March 31, 2026 Contract Approval (anticipated) April 1, 2026 Anticipated Construction Start May 1, 2026 Anticipated Construction Finish August 31, 2027 Scope of Services This project is for Phase 1 and Phase 2 of the HVAC systems replacement on the Campus at Lookout Mountain. The campus will remain occupied and operational throughout the project and strive to minimize the number and length of time that individual buildings will temporarily shutdown and vacated. The scope of services for Phase 1 of this project is as follows: Building #1 (Cottage): Bid Alternate Replace steam boiler system, air cooled chiller system and one outdoor air handling unit. Retrofit controls on the following existing equipment; (5) steam coils, (1) heat exchanger and crawlspace fan coil unit. Building #7 (Residential Unit): Base Bid Replace (3) wall hung boilers / associated hydronic specialties and (2) indoor multizone units. Includes conversion of multi-zone equipment to VAV with an estimated (16) VAV terminal unit zones. Building #8 (Cottage): Bid Alternate Replace (3) wall hung boilers / associated hydronic specialties and (5) split system condensing units / fan coil units. Building #9 (Residential Unit): Base Bid Replace (3) wall hung boilers / associated hydronic specialties, air cooled chiller system and (2) indoor multi-zone units. Includes conversion of multi-zone equipment to VAV with an estimated (16) VAV terminal unit zones. Building #13 (Residential Unit): Base Bid Replace (3) wall hung boilers / associated hydronic specialties, air cooled chiller system and (2) indoor multi-zone units. Includes conversion of multi-zone equipment to VAV with an estimated (16) VAV terminal unit zones. Building #40 (Administration): Bid Alternate Replace existing steam boiler systemThe scope of services for Phase 2 of this project is as follows: Building #2 (Cottage): Bid Alternate Replace existing steam boiler with new hot water boiler. Replace existing pneumatic controls with new DDC controls. Building #3 (Cottage): Bid Alternate Replace existing steam boiler with new hot water boiler. Replace existing pneumatic controls with new DDC controls. Building #4 (Cottage): Bid Alternate Replace existing steam boiler with new hot water boiler. Replace existing MAU with new MAU. Replace existing pneumatic controls with new DDC controls. Building #5 (Cottage): Bid Alternate Replace existing steam boiler with new hot water boiler. Replace existing pneumatic controls with new DDC controls. Building #17 (Central Dining): Base Bid Replace (2) two make-up air units and (8) eight exhaust fans. Demolish (1) one abandoned walk-in cooler condenser. Demolish existing exterior boiler and replace with new boiler in mechanical room. Replace (2) two indoor heating water pumps. Replace glycol feeder in same location.

Sub-Bidding

Jails / Prisons

$5,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
117
Bidding Soon
1,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

May 1, 2026

Project location map

Multiple Locations, Lakewood, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.