Demolition and site work for a water / sewer project in Bellevue, Michigan. Completed plans call for site work for a water / sewer project.

Construction of wastewater treatment plant improvements and replacements including demolition of solids handling pumps, piping, and valves, and demolition of other miscellaneous items as required. Improvements include a new pavilion above UV disinfection system, replacement of chemical feed pumps, new solids handling pumps and associated piping and valves, painting of existing basement, new solids digester aeration and mixing equipment including air piping and valves, new sidewalk and parking facility, and new natural gas generator. All required appurtenances, interconnecting piping and valving, electrical improvements, and controls are included. Bids are requested for the following Contract: Phase II Wastewater Treatment Plant Improvements. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from another source. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference. Construction Documents: a. Scope of Work. 1) Demolition of solids handling pumps, piping, and valves in the lab basement along with other miscellaneous items. 2) New generator, and ATS. 3) New chemical feed pumps. 4) New pavilion above UV disinfection system 5) Solids handling system improvements: convert anaerobic tanks to aerobic sludge digesters. Separate mixing and aeration. Solids handling equipment package. 6) New double disc diaphragm sludge pumps, piping and valves. 7) Laboratory basement painting 8) Site piping and electrical improvements 9) Site paving and sidewalk improvements b. Use of Site. 1) Staging area discussion 2) Coordination with existing construction efforts Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email to: Andrew Rudd, P.E.; arudd@gowightman.com Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$1,360,000.00

Public - City

Demolition, Site Work

30

22

9

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
258
Bidding Soon
1,992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 16, 2026

Project location map

9975 Battle Creek Hwy, Bellevue, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.