Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 7, 2026
Site work for a transportation facility in Victorville, California. Completed plans call for site work for a transportation facility.
Question Deadline 02/13/2026 at 4:00 PM PT Online Q&A Yes License Requirements General Engineering Class A Bid Valid 120 Days Liquidated Damages 500 per Calendar Day Project Duration 45 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% For further information, contact Ms. Sydney Morrison, at Sydney.morrison@sbmwd.org or (909)384-5393. The Contractor shall provide all labor, equipment, and materials, necessary for the "E" Street Pump Station Conditioning Pump Upgrades. Sewage lift station with a North and South wet well. Each well has one (1) conditioning pump that runs continuously to recirculate the influent sewage. This project will make the pumps removable without making entry into the wet wells. 1. Scope of Work The scope of work shall include, but may not be limited to the following: A. The Work of this Section provides for the labor of the demolition of the existing foul air equipment and the installation of the 2 rail systems in accordance with the drawings provided. B. All work in this section must follow the designed drawings unless otherwise approved by the Department in writing. C. The work provided in this section must meet CalOSHA and the Department's safety standards. D. SBMWD will coordinate the isolation and cleaning of the wet wells prior to the contractor performing the work. Only one wet well can be offline at a time. E. Demolish and dispose of 20" foul air duct and foul air scrubber as shown in drawing D-1. Install new 20" FRP flange onto existing pipe at the through wall stub out and install a new FRP blind flange. F. Perform a 3' X 3' sawcut through the existing deck for access to the new South submersible recirculation pump, as shown on the supplied prints. Concrete disposal by contractor. G. Scarify and patch exposed rebar. Repair and extend the PVC liner to cover the new deck opening. Inspection of the existing openings shall be performed with the Department present, and any repairs called out on the existing liner system shall be performed as part of this scope. H. Modify the concrete fillets in the wet well at the location of the new pump base. I. Install the 3" rail support at the bottom of the deck lid and at the base of the wet well. J. Install guide rail and intermediate brackets to the floor mounted rail support. K. Repeat the above steps for the North wet well, using the existing access cover L. Install additional discharge piping and anchor pump elbow to the floor. M. Exclusions _ Permits, special inspections and engineering are excluded (signed engineering plans are provided) _ SBMWD will provide all electrical disconnects and reconnects. _ New cover plates and access covers will be provided and installed by SBMWD. _ New concrete curb for the South access cover is not required and excluded from the scope. _ Pumps, guide rails, rail supports, elbows, and discharge piping will be provided by SBMWD. _ The davit base shown on the prints will not be installed as part of this project. This project is also subject to compliance monitoring and enforcement by the Department of Industrial Relations. The City of San Bernardino Municipal Water Department will no accept a bid nor will it contract or subcontract without proof of the contractor or subcontractor's current registration to perform public works under section 1725.5.
GC Bidding
Transportation Terminals
$20,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2026
April 28, 2026
E St, Victorville, CA
Related To This Project
Victorville, CA
Bid Date: Mar 04 2026
Victorville, CA
Bid Date: Mar 10 2026
Victorville, CA
--
Victorville, CA
Bid Date: Jan 28 2026
Victorville, CA
Bid Date: Jan 14 2026
Victorville, CA
Bid Date: Jan 14 2026
Victorville, CA
--
Victorville, CA
Bid Date: Dec 29 2025
Victorville, CA
Bid Date: Dec 29 2025
Victorville, CA
--
Victorville, CA
Bid Date: Dec 12 2025
Victorville, CA
--
Victorville, CA
--
Victorville, CA
--
Victorville, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.