BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a road / highway in Olivet, Michigan. Completed plans call for site work for a road / highway.

**As of February 19th, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** This project consists of reconstruction of 2026 LOCAL STREETS – SPRUCE STREET (Cottage Street to Butterfield Highway); YALE STREET (Main Street to Spruce Street) all within the City of Olivet Limits. Construction shall include areas of pulverizing, balancing, grading and repaving of existing bituminous roadway totaling approximately 7600 square yards; removal of excess pulverized material totaling approximately 525 cubic yards; replacement of bituminous leveling course and wearing course totaling approximately 1850 tons; manhole and water valve adjustments; signing and traffic control, cleanup and restoration and other miscellaneous work items that normally are included with the described work items. Email Caleb Neff (calebn@wolveng.com) for plans and specifications and clarify if you would like to be put on the bidders list. If any individual, corporation or partnership contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the Drawings, Specifications, or other parts of the documents, he may submit to the Owner a written request for an interpretation thereof. The person submitting the request will be responsible for its prompt delivery

Award

Roads / Highways

$194,193.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

March 9, 2026

Project location map

Multiple Locations, Olivet, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.