BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2026 at 7:00 PM

Updated April 3, 2026

Demolition, site work and new construction of a civil project in New Town, North Dakota. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; and for the demolition of a water / sewer project.

The Project includes the following Work: Construct a new 500,000-gallon composite elevated storage tank and appurtenances, electrical systems and control systems connection to existing distribution system and demolition of the existing at grade storage reservoir. Offsite work includes upgrades to pumps, appurtenances and electrical at the existing water treatment plant (WTP) and booster station (BS). The Work is comprised of either Contract No. 1 and No. 2 OR Contract No. 3: Contract No. 1 - General Construction; Contract No. 2 Electrical Construction and Contract No. 3 - Combined General and Electrical Construction. Individual Bids will be received for each Contract. The Owner will not accept a combined Bid unless that Bid is lower than the combined total of the lowest and best Bids for the Separate Contracts. The Work for each Contract is generally described as follows: Contract No. 1 - Water Tower and Pumps (General) Construction: Work generally consists of furnishing and installing a new 500,000-gallon composite water tower, including the design and installation of the foundation system; water tower appurtenances, hydrodynamic mixer, water tower logo, control room; all site work including site piping, special connections sump and sump pump, concrete floor, landscape grading, site restoration, seeding, and gravel access pad and demolition of existing at grade storage reservoir. Offsite work also includes, 1 - improvements at the existing WTP including removal of three (3) existing high service pumps, replacement and upgrades to the pumps, reinstallation of pumps and replacement of wafer check valves and flow meter and 2 - Improvements at the BS including replacement of four (4) vertical inline pumps and check valves. Contract No. 2 - Electrical Construction: Work at the new tower generally consists of installation of utility service, grounding electrode systems, general power and lighting systems, panelboards and SCADA equipment. Offsite work generally consists of 1 - WTP, disconnecting the three (3) existing high service pumps and reconnection once the pump upgrades are completed and wiring and integration of the new Flowmeter and 2 - BS, disconnecting the existing four (4) booster pumps and reconnecting when pump upgrades are complete. Contract No. 3: Combined General and Electrical Construction: Work includes construction consisting of the Work described under Contract No. 1 Water Tower and Pumps (General) Construction and Contract No. 2 Electrical Construction. All Bids shall be prepared according to the Instructions to Bidders contained within the Project Manual. Attached to the outside of the bid envelope must be a separate envelope containing a list of all addenda to the plans and specifications and an acknowledgment by the bidder of receipt of such addenda. The separate envelope shall also contain a bidder's bond in the amount of 5% of the full amount of bid executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within 10 days after notice of award shall execute a contract in accordance with the terms of the bid and a contractor's bond as required by law and the regulations and determinations of the governing body. Countersignature of a bid bond is not required under this section. All bidders must be licensed for the full amount of the bid as required by Section 47-07-05. A copy of the Contractor's License or Certificate of Renewal thereof, issued by the Secretary of State, must be enclosed in the bid bond envelope as required under Section 47-07-12. The Project has an expected substantial completion date of October 1, 2027. The estimated cost of this project is approximately $5.0 million. Funding This project anticipates funding from the Drinking Water and/or Clean Water State Revolving Fund program. Bidder's attention is called to the SRF requirements in the bid package. Bidders on this work will be required to comply with the American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Bidders are required to comply with Davis-Bacon prevailing wage requirements. QA date - 02/03/2026 noon Bidder shall submit all questions about the meaning or intent of the Bidding Documents to both Engineer and Owner in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Bid Result General Construction - Gerard Tank & Steel , Inc - 4559300 Electrical Construction - Wescom , Inc - 252157 Combined General and Electrical Construction -Phoenix Fabricators - $5,865,360

Bid Results

Water / Sewer

$10,676,817.00

Public - City

Demolition, New Construction, Site Work

85

36

5

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
70
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

April 7, 2026

Project location map

ND-1804, New Town, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.