BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work for a civil project in New Town, North Dakota. Completed plans call for site work for a water / sewer project.

New Town Sand Hill Water Tower Electrical Re-Bid The Project includes the following Work: Electrical systems and control systems in association with construction of a new 500,000-gallon composite elevated storage tank and appurtenances, connection to existing distribution system, and demolition of the existing at grade storage reservoir. Offsite work includes upgrades to electrical at the existing water treatment plant (WTP) and booster station (BS). The Work for the Contract is generally described as follows: Contract No. 2 - Electrical Construction: Work at the new tower generally consists of installation of utility service, grounding electrode systems, general power and lighting systems, panelboards and SCADA equipment. Offsite work generally consists of 1 - WTP, disconnecting the three (3) existing high service pumps and reconnection once the pump upgrades are completed and wiring and integration of the new Flowmeter and 2 - BS, disconnecting the existing four (4) booster pumps and reconnecting when pump upgrades are complete. All Bids shall be prepared according to the Instructions to Bidders contained within the Project Manual. Attached to the outside of the bid envelope must be a separate envelope containing a list of all addenda to the plans and specifications and an acknowledgment by the bidder of receipt of such addenda. The separate envelope shall also contain a bidder's bond in the amount of 5% of the full amount of bid executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within 10 days after notice of award shall execute a contract in accordance with the terms of the bid and a contractor's bond as required by law and the regulations and determinations of the governing body. Countersignature of a bid bond is not required under this section. All bidders must be licensed for the full amount of the bid as required by Section 47-07-05. A copy of the Contractor's License or Certificate of Renewal thereof, issued by the Secretary of State, must be enclosed in the bid bond envelope as required under Section 47-07-12. The Project has an expected substantial completion date of October 1, 2027. This project anticipates funding from the Drinking Water and/or Clean Water State Revolving Fund program. Bidder's attention is called to the SRF requirements in the bid package. Bidders on this work will be required to comply with the American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Bidders are required to comply with Davis-Bacon prevailing wage requirements. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Bidders are required to comply with Build America, Buy America Act requirements. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Question Deadline 03/13/2026 at 12:00 PM CT Bidder shall submit all questions about the meaning or intent of the Bidding Documents to both Engineer and Owner in writing.

Bid Results

Water / Sewer

$215,995.00

Public - City

Site Work

22

16

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

May 17, 2026

Project location map

To Be Determined, New Town, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.