BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Renovation of an educational facility in Omaha, Nebraska. Completed plans call for the renovation of a educational facility.

Millard Public Schools will accept sealed bids for the construction project generally described as the Hitchcock Elementary Temperature Control Replacement. To obtain bid documents, contact A&D Technical Supply at (402) 592-4950 ext 4 or order through the A&D Virtual Plan Room at www.adtechsupply.com. The cost of printing and shipping (as applicable) drawings and specifications shall be paid by the prospective bidder requesting the documents. A. The entire project is within the Hitchcock Elementary School campus, 5809 South 104 th Street, Omaha, NE. The project consists of replacing the existing temperature control system in its entirety. B. Work under this contract includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required for the construction of the Hitchcock Elementary School Temperature Control System Replacement project located at 5809 South 104 th Street, Omaha, NE. C. Renovations will take place during staff and student summer vacation but various areas of the facility will be occupied by summer school activities. Contractors and Cottonwood staff will work closely to isolate areas of work. D. Work in the facility shall be allowed during normal working hours throughout the project, however, the contractor must provide, at all times, for clear exit paths, proper lighting, and fire/smoke protection (subject to approval of all authorities having jurisdiction) and protection against any and all fumes and odors caused by construction activities. The contractor shall halt or modify any activities the Owner determines to be disruptive in any manner to their continued use of the building. E. In addition to any temporary walls shown in these documents, temporary walls may be required in areas of construction depending on the type of work being performed in certain areas. See Division 01 50 00-Temporary Facilities for additional requirements. Any questions regarding the meaning of any portion of the contract documents shall be submitted to the Architect/Engineer for interpretation. Definitive interpretations or clarification will be published by addenda or supplemental information. Verbal interpretation not issued by addendum or supplemental information shall not be considered part of the contract documents.

Sub-Bidding

Educational

$300,000.00

Public - City

Renovation

9

10

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
87
Bidding Soon
865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

June 1, 2026

Project location map

5809 S 104th St, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.