BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Victorville, California. Completed plans call for site work for a water / sewer project.

Cost estimate is $30,000 to $60,000. This project consists of installing two Reduced Pressure Detector Assemblies (RPDA) and two Post Indicator Valves (PIV) in accordance with all applicable codes, standards, and Authority Having Jurisdiction (AHJ) requirements. The scope includes removal and proper disposal of the existing PIVs and furnishing and installing two new PIVs in accordance with applicable codes and standards. The installation of the RPDAs and replacement PIVs will provide proper backflow protection, reliable system isolation, and bring the fire protection system into compliance with all applicable local, state, and Authority Having Jurisdiction requirements. Question Deadline 02/25/2026 at 2:00 PM PT Building 686 Reduced Pressure Detector Assembly Installation The Contractor shall install one SCLA provided 6-inch RPDA and one SCLA provided 8-inch RPDA on the designated service line, including all necessary labor, materials, piping, fittings, valves, and supports for a complete and code-compliant installation. The Contractor shall provide proper bracing, supports, thrust blocks, and bedding as required. The Contractor shall ensure all devices are installed per manufacturer specifications and local fire/water requirements. The Contractor shall perform flushing, pressure testing, and certification of the RPDA. The Contractor shall remove and dispose of existing PIV. Then Contractor shall furnish and install two new PIV of appropriate size and type as approved by the AHJ. The Contractor shall set the PIV to proper elevation, orientation, and clearance requirements. The Contractor shall ensure full operational testing for the two PIV, including open/close verification. The Contractor shall restore all paving, asphalt, concrete, and landscape areas to equal or better condition than existed prior to work. The Contractor shall remove and dispose of all debris, excess materials, and spoils from the site. All work shall comply with current plumbing, fire, and water purveyor standards. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$38,874.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 3, 2026

Project location map

18374 Readiness St, Victorville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.