BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work and paving for a road / highway in Dubuque, Iowa. Completed plans call for site work for a road / highway.

HMA Resurfacing on Hammerand Road from Sherrill Road NE 2.5 miles to Circle Ridge Road in sections 19, 20, 17, & 16 of Peru Township, T90N R2E. The work involves furnishing the specified materials in the quantities required and providing the necessary machinery, equipment, labor, and expertise to competently complete the project as described in the plans and specifications. Quantities of work required are approximate and subject to increases and decreases; all work actually required must be performed at the unit prices stipulated. Payment may be made after July 1, 2026, and winter work is not allowed. The contractor agrees to complete the work within the contract period or pay liquidated damages for each additional working day that the work remains incomplete. "Extra work" required to complete the project will be performed at unit prices, lump sums agreed upon in writing, or on a "force-account basis" as provided in the specifications. The Iowa Department of Transportation Standard Specifications for Highway and Bridge Construction, series 2023, plus General Supplemental Specifications and applicable Special Provisions, apply to construction on this project. The contractor is eligible for a State of Iowa Sales Tax exemption on materials for the project. Instructions to bidders include: Proposals must be filed on the forms furnished, sealed, and plainly marked; proposals may be rejected if containing reservations not provided for in the forms. A certified check, cashier's check, or bid bond must accompany each proposal. The selected contractor must furnish a performance bond within fifteen days of contract approval. Consideration will be given to locally owned businesses if costs are relatively equal. Preferences are given to products and provisions grown and coal produced in Iowa, and resident bidders as against nonresidents from states or countries with bidder preferences. Compliance with Civil Rights regulations and substance abuse prevention program requirements for CDL personnel is required. Proposals must be received by the specified deadline as stated in the bid documents. Acceptance of a bid is subject to review and confirmation, and no contract is created until execution of a written contract by all parties. Location and Description: Hammerand Road: from Sherrill Road NE to Circle Ridge Road

GC Bidding

Roads / Highways

$1,000,000.00

Public - County

Paving, Site Work

9

3

3

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
156
Bidding Soon
1,163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

September 7, 2026

Project location map

To be determined, Dubuque, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.