BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an elderly care / assisted living facility in Laconia, New Hampshire. Completed plans call for the renovation of a elderly care / assisted living facility.

Award details not available. Belknap County is soliciting proposals from qualified mechanical contractors to furnish all labor, materials, equipment, supervision, and coordination necessary to remove, replace, refurbish, and upgrade the existing glycol-based chilled water loop serving the air-conditioning systems at the Belknap County Nursing Home. The completed work shall achieve and maintain proper freeze protection for chilled water systems while ensuring reliable cooling performance at -10 degrees Fahrenheit. 2. Existing Conditions The facility is served by a closed-loop chilled water glycol system providing cooling to air-handling units and terminal cooling coils. The existing system contains glycol that is to be removed and replaced. Proposers shall verify all existing conditions, piping configurations, and system volume prior to beginning work. 3. Base Scope of Services The successful proposer shall provide, at a minimum, the following services: A. Glycol Removal and Disposal Remove existing glycol from the chilled water loop using a pump truck or approved equivalent method. Collect, transport, and disposal of removed glycol in accordance with all applicable federal, state, and local regulations. B. New Glycol Supply, Concentration, and Freeze Protection Furnish and deliver approximately 2,200 gallons of inhibited industrial propylene glycol, premixed and suitable for chilled water air-conditioning applications. Provide a glycol concentration sufficient to achieve proper freeze protection for chilled water systems, accounting for outdoor exposure, piping locations, and coil freeze risk. Final glycol concentration shall provide not less than the minimum freeze protection temperature recommended for institutional chilled water systems, typically no warmer than -10F freeze point (or as required based on site conditions). Refill the chilled water loop with properly mixed glycol solution following completion of system preparation and purging. C. System Modifications Install two (2) new 2-inch chilled water/glycol transfer taps with hose connections on system mains to facilitate glycol transfer, testing, and future maintenance. D. Automatic Glycol Feeder - Chilled Water System Furnish and install a permanently mounted automatic glycol feeder specifically designed for closed-loop chilled water systems. Feeder shall be capable of maintaining system pressure without diluting glycol concentration below the required freeze protection level. Provide all associated piping, isolation valves, check valves, backflow prevention, and electrical connections required for complete installation. Integrate feeder in a manner that preserves glycol concentration and freeze protection at all times. Fill feeder with compatible glycol solution and place the unit into service. Test and commission the feeder to verify proper pressure regulation and operation. Provide basic operational training to County facilities staff. E. System Purging, Venting, and Verification Purge chilled water mains, coils, and associated piping to remove air and ensure proper circulation. Coordinate with facility staff to confirm air vents are operational prior to refill. Test and verify final glycol concentration using calibrated test equipment. Provide written documentation confirming achieved freeze protection temperature and system operating pressure. F. System Downtime Contractor shall plan work assuming an approximate 24-hour chilled water system shutdown, including glycol removal, feeder installation, system refill, and purging. Contractor shall identify proposed schedule, sequencing, and contingency plans if downtime exceeds the anticipated duration. 4. Optional / Add Alternate Scope Chilled Water System Cleaning and Flushing (Add Alternate) Furnish and install an approved chilled water system cleaner compatible with glycol systems. Inject approximately 20 gallons of cleaning solution into the chilled water loop. Fill system with water and circulate through cooling equipment for approximately 24 hours. Drain and properly dispose of cleaning solution and water (no reclaim). Refill system with glycol solution meeting the freeze protection requirements specified in the Base Scope. Base Scope - Chilled Water Glycol System Refurbishment Includes removal and disposal of existing glycol; furnishing and installation of new inhibited propylene glycol; installation of two (2) 2-inch glycol transfer taps; system refill, purging, venting, testing; verification of final glycol concentration and freeze protection; coordination and system shutdown. Automatic Glycol Feeder - Chilled Water System Furnish and install automatic glycol feeder complete with piping, valves, backflow prevention, electrical connections, commissioning, and staff training. Feeder should maintain system pressure without dilution of glycol concentration below required freeze protection levels. Add Alternate No. 1 - Chilled Water System Cleaning and Flushing Provide chemical cleaner; inject cleaner; circulate system for 24 hours; drain and dispose; refill system with glycol meeting specified freeze protection requirements. Chilled Water Glycol System Refurbishment - Belknap County Nursing Home 30 County Drive, Laconia, NH 03246 The County reserves the right to accept or reject any and/or all proposals. The County reserves the right to cancel this request at any time for any reason.

Award

Elderly Care / Assisted Living

$500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
201
Bidding Soon
2,279
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 3, 2026

Project location map

30 County Dr, Laconia, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.