BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Site work and paving for a sidewalk / parking lot in Butte, Montana. Completed plans call for site work for a sidewalk / parking lot.

Sealed Bids For The Replacement Of Asphalt In Butte-Silver Bow Sealed bids are requested for the replacement of asphalt for projects located in Butte-Silver Bow. All bids must be accompanied by an amount of not less than ten percent (10%) of the aggregate of the bid proposed, which can be in the form of lawful monies of the United States, a cashier's check, certified check, bank money order or bank draft drawn and issued by a National Banking Association located in the State of Montana, or a bid bond executed by a surety corporation authorized to do business in the State of Montana. These securities will be forfeited as liquidated damages if the contract requirements are not entered into within fifteen days after the date of award. Each bidder is required to have a business license prior to acceptance of the bid. Federal excise, local, or state tax should not be included as Butte-Silver Bow is exempt. Montana Prevailing Wage rates shall apply. The successful bidder must comply with all applicable Federal Regulations and Requirements, including but not limited to the Equal Opportunity Clause, Executive Order 11246 and 11624, Federal Labor Standards, and Civil Rights Act. The City-County of Butte-Silver Bow reserves the right to negotiate an agreement based on fair and reasonable compensation for the proposed scope of work and services, as well as to reject any and all bids and accept the bid deemed to represent the best interests of the City-County of Butte-Silver Bow. This contract is scheduled to be awarded on February 25th, 2026 Questions regarding the documents shall be submitted in writing to Zane Gleason, Public Works Project Manager, 126 W Granite St, Butte, Montana 59701, or Email: zdgleason@bsb.mt.gov. The project consists of a 2" mill/fill along various streets in the City of Butte, Montana. The mill/fill will encompass the removal and replacement of approximately 46,323 square yards of asphalt. The work shall also include traffic control, valve and manhole adjustments and other miscellaneous work associated with the asphaltic replacement in streets

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

May 1, 2026

Project location map

To be determined, Butte, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.