BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2026 at 8:00 PM

Updated March 28, 2026

This is a service / maintenance or supply contract in Fullerton, California. Contact the soliciting agency for additional information.

The City will contract with one or more qualified consulting firms to provide on-call, as-needed professional environmental consulting services to the Planning Division for preparation, review, and support of environmental documentation pursuant to the California Environmental Quality Act (CEQA). Services include, but are not limited to, preparation and review of Environmental Impact Reports, Initial Studies, Negative Declarations, Addenda, Consistency and Checklist Analyses, CEQA Exemption Documentation, technical studies, peer review, and advisory and procedural support throughout project processing. Consultants may also need to prepare or manage technical analyses for a range of environmental topics such as aesthetics, air quality, biological resources, cultural resources, geology, hazards, hydrology, land use, noise, population, public services, recreation, transportation, tribal consultation, cumulative and growth-inducing impacts, alternatives analysis, and mitigation development. Additional services may include preparation of Health Risk Assessments, noise modeling, and other specialized analyses as requested. Consultants are responsible for comprehensive project management, including schedule and budget tracking, document preparation, public review support, and coordination with City staff, applicants, agencies, and the public. All work must be in compliance with applicable laws, guidelines, court decisions, and City procedures, and all deliverables must be suitable for public review and decision-making. Consultants must demonstrate flexibility to manage multiple concurrent assignments and be able to provide high-quality, legally defensible environmental documentation on a task order basis. Selection for the on-call list does not guarantee a minimum amount of work. Question Deadline 02/27/2026 at 4:00 PM PT

Post-Bid

Municipal

$2,000,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
2
Bidding Soon
2,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

May 11, 2026

Project location map

To be determined, Fullerton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.