BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated March 23, 2026

Site work for a sidewalk / parking lot in Selma, Alabama. Completed plans call for site work for a sidewalk / parking lot.

The contractor shall remove twelve LED parking lot and pier lights, remove unnecessary electrical wiring and components, install nine solar LED streetlights and three solar LED floodlights, install required electrical components, accessories, and mounting equipment, and repair remaining openings on light poles in accordance with the scope of work. Location: U.S. Coast Guard Shore Side Detachment, 1900 Coast Guard Road, Demopolis, AL 36732. This is set aside 100% for small business. Offerors must be actively registered in SAM.gov. Payment and performance bonds are not required. The United States Coast Guard is accepting proposals for qualified individuals or firms to provide services for the removal of 12 LED parking lot and pier lights, removal of unnecessary electrical wiring or components, installation of 9 solar LED streetlights and 3 solar LED floodlights, installation of necessary electrical components or accessories, installation of necessary mounting equipment, and repair of remaining openings on light poles in in Demopolis, AL. U.S. Coast Guard Cutter WEDGE (WLR-75307) is accepting proposals for qualified individuals or firms to provide services for the removal of 12 LED parking lot and pier lights, removal of unnecessary electrical wiring or components, installation of 9 solar LED streetlights and 3 solar LED floodlights, installation of necessary electrical components or accessories, installation of necessary mounting equipment, and repair of remaining openings on light poles. Contractor will provide 9 new solar LED streetlights and 3 new solar LED floodlights to meet minimum specifications to adequately illuminate the required area and at minimum meet the specifications of lights being removed, necessary electrical components, mounting equipment, hardware, or any unlisted supplies needed for installation. Contractor will provide any trim, hardware, caulk, or sealing materials needed to complete. Contractor will also perform function tests on new lights. We request contractors furnish labor, materials, and equipment to replace above noted items. Prior to submitting a quote, it is mandatory to examine the SOW and it is highly recommended to conduct a site visit to the facility to take field measurements, evaluations, etc, and become familiar with existing conditions under which the work will be performed

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 16, 2026

Project location map

1900 Coast Guard Rd, Selma, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.