Published April 20, 2026 at 8:00 PM
Updated May 20, 2026
Site work and renovation of a water / sewer project in Crest Hill, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
IDFPR NO. 184-001273 The Project includes the following work at two different locations: At the West Station, construction of a 22 foot by 34-foot brick and block receiving/metering station and associated electrical improvements; supervisory control and data acquisition (SCADA) system; and heating, ventilation, and air conditioning (HVAC). Site work at the West Station includes underground piping, concrete driveway, and landscaping. At the East Station, work will include construction of a 80-foot by 39-foot brick and block receiving/pump station and associated electrical improvements; SCADA system; HVAC; yard piping; and site work. Site work at the East Station includes underground piping valving, sanitary and storm sewers, a concrete driveway, and landscaping. There will be two bid alternatives. One Bid Alternative will be for a system-wide SCADA upgrade. SCADA upgrades will be done at OWNER's existing wellhouses and water treatment plants. A second bid alternative will consist of construction of approximately 2,000 feet of buried conduit and conductors along with miscellaneous electrical improvements. The proposed conduit will be installed running from the proposed East Receiving/Pumping Station to an existing diversion structure west of the East Receiving Station. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. Bidders will be required to comply with all laws, including those relating to the employment of labor and the payment of the general prevailing rate of hourly wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work (including, but not necessarily limited to 820 ILCS 130/1-12 the "Prevailing Wage Act") as ascertained by the City or by the Illinois Department of Labor for Will County, Illinois shall be paid for each craft or type of worker needed to execute the contract or to perform such work. If at the time this Contract is executed, or if during the term of this Contract, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570, as two consecutive months of unemployment exceeding 5%, CONTRACTOR agrees to employ a work force that consists of at least 90% Illinois laborers. An "Illinois laborer" is defined as any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. The Bidder shall require all subcontractors (if any) to conform with said laws, and any rules or regulations now and thereafter issued pursuant to said laws by Bidder, his subcontractors, and/or anyone working through or on behalf of Bidder or Bidder's subcontractors. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency. Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least 16 days prior to bid opening. The policy is contained in the Specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. The City of Crest Hill reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 135 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder for the Base Bid. Bid alternatives will be considered after the low responsive bidder is selected. Completion- 730 calendar days MBE (20.9%), WBE (6.9%) Duration- Aug. 30, 2026 --Aug. 29, 2028 Locations- WESTERN RECEIVING SITE-2305 CATON FARM ROAD, CREST HILL, ILLINOIS 60403 EASTERN RECEIVING SITE -861 CATON FARM ROAD, CREST HILL, ILLINOIS 60403
Bid Results
Water / Sewer
$8,507,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2026
August 30, 2026
Multiple Locations, Crest Hill, IL
Related To This Project
Crest Hill, IL
Bid Date: Mar 30 2026
Crest Hill, IL
Bid Date: Mar 26 2026
Crest Hill, IL
Bid Date: Mar 23 2026
Crest Hill, IL
Bid Date: Apr 21 2026
Crest Hill, IL
Bid Date: Apr 16 2026
Crest Hill, IL
Bid Date: Apr 24 2026
Crest Hill, IL
Bid Date: Apr 16 2026
Crest Hill, IL
Bid Date: Mar 10 2026
Crest Hill, IL
Bid Date: Dec 05 2025
Crest Hill, IL
Bid Date: Oct 27 2025
Crest Hill, IL
--
Crest Hill, IL
Bid Date: Aug 22 2025
Crest Hill, IL
Bid Date: Aug 07 2025
Crest Hill, IL
Bid Date: Jul 11 2025
Crest Hill, IL
Bid Date: Jul 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.