BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work and paving for a mixed-use development in South Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

9th Avenue Roadway Rehabilitation (Columbia Avenue to Milwaukee Avenue) - Base Bid, Marquette Avenue (8th Avenue to 9th Avenue) - Alternate A, and Fire Department Parking Lot - Alternate B for the City of South Milwaukee, Milwaukee County, Wisconsin. The work includes asphalt pavement removal, HMA pavement, concrete pavement, concrete curb and gutter, concrete sidewalk, storm sewer pipe reinforced concrete, manholes and catch basins, sanitary sewer spot replacement, water main relay, water service lateral, hydrant assembly, and miscellaneous quantities of excavation, pavement markings, and restoration. Bids must include specified items and quantities for proposal submission. All proposals must be placed in a sealed opaque envelope marked as specified. Bids must be submitted with a certified check or bid bond not less than 5% of the bid. The successful bidder must file a contract and a performance bond in the amount of 100% of the total proposal price within 10 working days after award. Only proposals submitted on the official form will be accepted. The City of South Milwaukee reserves the right to reject any or all bids and waive any informalities in the bidding. No bids may be withdrawn for 30 days after the scheduled bid opening date. Pre-qualification requirements: Prequalification forms for 2026 are required to be on file in the Office of the City Engineer for all contractors and subcontractors at least seven days prior to bid opening. Forms are available from the Engineer's Office upon request or on the City's website. The Common Council's decision as to qualification shall be final. Questions pertaining to receiving document sets should be directed to Lynda Wolak at lwolak@smwi.org (414) 762-2222, ext. 157. Document sets can be examined at the Office of the City Engineer, South Milwaukee City Administration Building, 2424 15th Avenue, South Milwaukee, Wisconsin 53172. Est. Completion Date: Oct. 31, 2026

Award

Roads / Highways

$3,403,738.00

Public - City

Paving, Site Work

86

6

11

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
2
Bidding Soon
1,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 11, 2026

Project location map

9th Ave, South Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.