Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 20, 2026
Site work, paving and new construction of a bridge / tunnel in Bend, Oregon. Completed plans call for site work for a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.
The City of Bend seeks a progressive design-builder to deliver the Market Road Bridge Project through final design and construction. The project, which is partially funded by the Federal Railroad Administration, will eliminate the at-grade BNSF crossing on Market Road. The City has a design and construction budget of approximately $46,000,000 based on a class 4 estimate funded through the Federal Railroad Administration and the City of Bend's 2020 Transportation General Obligation Bond. General Scope The first phase of the project involved Preliminary Engineering ("PE") and National Environmental Policy Act ("NEPA") analysis for the railroad overcrossing. The first phase was funded by the City's current grant from the FRA. The City was also awarded funds for "final design and construction" in the amount of approximately $32,000,000, which can only be obligated after FRA approval of NEPA and PE. The City anticipates signing a grant agreement for these funds during the first half of 2026. Provide design-build services to complete the design and construction of the Project. The general project elements include: 1. Structural bridge over the BNSF railroad 2. 9th Street connection into Market Road 3. Associated roadway/pedestrian improvements 4. Pedestrian underpass north/south connection to 9th Street key route. The Project anticipates a "Categorical Exclusion" from the NEPA review. The PE phase of the project delivered a bridge span within BNSF right-of-way that was conceptually acceptable to BNSF. The span achieved the City's preference to maintain a connection from 9th Street into Market Road. The conceptual design also allows for one future railroad track and two future access roads. This conceptual design may be refined as the project progresses so long as BNSF and FRA are agreeable to any proposed modifications.
Post-Bid
Bridges / Tunnels
$46,000,000.00
Public - City
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
July 31, 2026
SE Reed Market Rd, Bend, OR
Related To This Project
Bend, OR
Bid Date: Apr 07 2026
Bend, OR
Bid Date: Apr 02 2026
Bend, OR
Bid Date: Mar 11 2026
Bend, OR
Bid Date: Apr 08 2026
Bend, OR
Bid Date: Apr 21 2026
Bend, OR
Bid Date: Apr 21 2026
Bend, OR
Bid Date: Mar 17 2026
Bend, OR
Bid Date: Mar 17 2026
Bend, OR
Bid Date: Mar 04 2026
Bend, OR
Bid Date: Feb 25 2026
Bend, OR
Bid Date: Feb 25 2026
Bend, OR
Bid Date: Mar 06 2026
Bend, OR
Bid Date: Mar 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
