BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 30, 2026 at 8:00 PM

Updated March 31, 2026

Renovation of a water / sewer project in El Dorado, Kansas. Completed plans call for the renovation of a water / sewer project.

The work includes the replacement of all filter control valves and associated electronic actuators at the El Dorado Water Treatment Plant, covering five filters and the Surface Wash, Influent, Filter to Waste, Waste/Drain, Backwash, and Effluent systems, with exceptions as noted. All components must be compatible with existing systems and integrated with plant controls. The contractor is responsible for supplying materials, labor, equipment, testing, calibration, commissioning, and must provide at least a 1-year warranty on parts and labor. Work must comply with all relevant regulations and be coordinated with plant staff to maintain functionality, potentially requiring off-peak or phased scheduling. Actuators for Effluent valves are not required as existing actuators are new. Bid submissions must be in sealed format and include itemized pricing, a total lump-sum bid, a proposed schedule with milestones, a list of any subcontractors, proof of insurance and certifications, and references from at least three similar projects. A mandatory pre-bid site visit is required. All questions must be submitted in writing prior to the deadline.

Award

Water / Sewer

$500,985.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
20
Bidding Soon
300
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

March 6, 2026

Project location map

380 E Central Ave, El Dorado, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.