Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2026 at 8:00 PM
Updated March 18, 2026
Site work and paving for a road / highway in Bloomer, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of March 17 , 2026, the project was awarded to Senn Hot Mix but the awarded amount is not available.** The work involves pulverizing, paving, and shouldering on Cooks Valley Town road 70th St., starting at 150th Ave. and going north toward 160th Ave., approximately 5017 feet in length and 20 feet in width. The project includes pulverizing the old road bed, injecting Aggregate Base Stabilizer, compacting and grading, paving with a 2 1/2 - inch compacted depth (two 10-foot lanes with 3% slope from the center, including driveway and mailbox bump outs), and shouldering with1/2 inch gravel, 2 feet wide compacted on both sides of the road, including driveway leveling. Contractors must comply with all State and Federal Air and Water Quality Standards, provide an engineer's certificate upon completion, and are responsible for traffic control. Bids must be completed on the township's bid form, submitted in a sealed envelope, and include a current Certificate of Liability Insurance. The Town Board reserves the right to reject any or all bids or parts of bids and to accept the bid most advantageous to the township. Completion date is before October 1, 2026.
Award
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2026
July 1, 2026
70th St starting at 150th Ave going north toward 160th Ave, Bloomer, WI
Related To This Project
Bloomer, WI
Bid Date: Oct 16 2025
Bloomer, WI
Bid Date: May 11 2020
Bloomer, WI
Bid Date: Sep 17 2025
Bloomer, WI
Bid Date: Jun 20 2025
Bloomer, WI
--
Bloomer, WI
Bid Date: May 13 2025
Bloomer, WI
Bid Date: Apr 28 2025
Bloomer, WI
Bid Date: Apr 22 2025
Bloomer, WI
Bid Date: Mar 24 2025
Bloomer, WI
Bid Date: Mar 12 2025
Bloomer, WI
Bid Date: Oct 17 2024
Bloomer, WI
Bid Date: Apr 08 2025
Bloomer, WI
Bid Date: Jan 13 2026
Bloomer, WI
Bid Date: Dec 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
