BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, new construction and remodeling of a fire / police facility in Morton, Washington. Completed plans call for the remodel of a fire / police facility; for the demolition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.

Lewis County Fire District #4 is seeking qualified general contractors to submit a bid for the remodel of the existing building and new construction. Remodel a current steel building onsite Into offices. kitchen, bathrooms/showers, weight room, steeper quartans and Ambulance bay. Completely demolish & remove existing building. Complate ground work, sewer, wafer & power. Build an 8 bay pole building per plan. . Remodel Mate building . Cummins 20KW propane 80 gal tank powered to both buildings and gate . Match steel siding whera 3 bay doom mmoved . Re-use 3 doors on 8 bay . Exterior Door enfry's-Asphalt . Smoke/CO2 alarms/cioteutors(Both buildings) Heatlng/AC heat pump . Canned LED adjustable lights(Suth buildings) . Sensor exhaust system/amb . Garage door opener Insulated walls/amb . Wire ter ambulance & plug . Stairs up to left . Storage under stalra, seated door(haw) . Wire in 4 plugs . Sheetrack in storage, smooth, flat white paint . Sealed steel door w/oomb took between amb & kitchen area . Satin doorlwer handfes(Both buildings) . Garage door openers . Fire exttegwslw(Both) . GuSem(Both) . Mow 3 phase to main building reusing all existing panels . Complete fencing . Remote control gatefpad .20x20 concrete extrication pad Asphalt Electrical underground between buildings Sewer/water hook up . Waterproof snap fioonngflight wood color . Carpet in weight room, nut hallway area . Sheetrock, light spackle, flat white paint in all offices, sleeper Q's, weight room. . White tern . White cabinets, kitchen, bathrooms . ADA toilets & toilet roll hokters(Both buildings) . Showers w/curtates & grab bars(Bath buildings) . Fans in bathrooms(both) . Commercial grade vinyl flooring in all bathrooms . Light spackle in all bathrooms, showers & kitchen area. Semi gloss washable paint . Nickel faucets (Both buildings) Deep 2 tub Stainless sink in kitchen Tail gooseneck faucet In kitchen . White round porcelain sinks in all bathrooms Formica or granite. eountertops(Both) Formica or Granite . Wire lobby door for entry alarm . Security windowfHoily's office)Have . Steel eotsy doora(4)w/combinations Both buildings . Wire TV hook up, training room . Wire for phones/Fax in #1 office . Wire for DVR cameras all entry doors Motion sensora for lights at all entry doors inside & out

Post-Bid

Fire / Police

$5,000,000.00

Public - County

Demolition, New Construction, Remodeling, Site Work

18

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
145
Bidding Soon
1,860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

May 19, 2026

Project location map

214 2nd St, Morton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.