BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a civil project in Morton, Washington. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Site Directions: The project is located at Gifford Pinchot National Forest, Sec. 19,30,31 T., 04N., R., 05E., W.M., Lat. 45 47' 39.5" N, Long. -122 13'59.6"W. If you have any questions, please call Justin Long, Project Manager, DNR Federal Lands Lead Engineer, in Olympia, Washington at (360) 867-8412 Est. Completion Date: June 30, 2025 DNR is collaborating with the Gifford Pinchot National Forest to provide reconstruction and maintenance on the FS-4100000 and 4109000. This project maintains 3.30 miles of roadway, reconstructs 4.10 miles of roadway including placing and compacting approximately 3429 tons of 1-1/4 Inch crushed rock and 1347 tons of 3-inch crushed rock. The project installs 1 drainage culvert including 28 tons of light loose rip rap armoring, removes 1 drainage culvert, and constructs 16 drivable waterbars, and 2 sets of sediment traps. The estimated cost of the project is $340,000, and the required substantial and final completion date is June 30, 2025. The project is located at Gifford Pinchot National Forest, Sec. 19,30,31 T., 04N., R., 05E., W.M., Lat. 45 47' 39.5" N, Long. -122 13'59.6"W.

Bid Results

Roads / Highways

$323,605.00

Public - State/Provincial

Paving, Site Work

7

10

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
93
Bidding Soon
1,124
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

To Be Determined, Morton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.