BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in West Sacramento, California. Completed plans call for site work for a water / sewer project.

The work performed includes the furnishing of all labor, materials, equipment and supervision for the construction of the Blacker Drainage Canal Slope Rehabilitation Project. This consists of construction of Terramesh Green Slope System, Terramesh Mineral Slope System, rock slope protection, culvert installation, dust control, drain pipe installation, SWPPP, embankment work, structural excavation, structural backfill, aggregate base, and other work as necessary to complete the project. All work must be completed by the specified date, with required environmental time constraints. The Project is within West Sacramento, Yolo County, California. The Project Area lies within Reclamation Districts (RD) 900 and is owned and operated by RD 900. Each bid must be submitted on the specified form and accompanied by bid security not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder will be required to execute Material and Labor Payment Bond and Performance Bond each for not less than one hundred percent (100%) of the contract price. Bidders and listed subcontractors must be registered with the Department of Industrial Relations. The contract is subject to Federal Labor Standards Provisions, Equal Employment Opportunity requirements, Minority Business Enterprise development, and FEMA Procurement Disaster Assistant Team requirements. All labor on the project must be paid no less than the minimum wage rates as established by the U.S. Secretary of Labor or as determined by the Director of the California Department of Industrial Relations. Doc Note: For RD 900 related questions, please contract Blake Johnson at +1-916-371-1483 or bjohnson@rd900.org. Each bid must be submitted on the bid form provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to RD 900, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. CONSTRUCTION COST: $2,900,000 to $3,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$3,857,675.00

Public - County

Site Work

16

12

48

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
254
Bidding Soon
3,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

June 2, 2026

Project location map

Multiple Locations, West Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.