BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a municipal facility in New Buffalo, Michigan. Completed plans call for the renovation of a municipal facility.

The scope of work includes the 1-for-1 replacement of one natural gas-fired Bryan AB120-W-FDG flexible water tube boiler and three Trane Climate Changer indoor air handling units (AHUs). Contractors are responsible for the removal and disposal of existing units and the installation of new equipment in the existing footprints. All reconnections to gas, hydronic, and 208V/3Ph electrical services are included. AHU-3 motor size is field-verified at 1.5 HP. The boiler must be furnished in a Reverse Construction configuration. The office and breakroom mini-split units are excluded. All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity. Bid responses and attachments must be uploaded to SIGMA VSS. Contractors should submit a maximum of two attachments (each less than 25 MB): one for bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.), and, if applicable, the other for Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership, and Proof of Service-Connected Disability). SIGMA VSS will not allow proposals to be submitted after the deadline. If electronic submission issues occur, contact the SIGMA Help Desk prior to the deadline. Approved emailed submissions must be received by the deadline to be considered. Bid Responses should not be emailed to the Project Director. 5% Bid Security is required. Questions should be emailed to the specified contact by the stated deadline. Please do not submit online questions via online. ALL questions should be emailed to Curt Carlson at carlsonc7@michigan.gov no later than 2:00 p.m., Eastern on Friday March 20, 2026. Event Site Walkthrough note: LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). An individual is only permitted to represent one bidder at a mandatory walk-through.

Bid Results

Municipal

$164,975.00

Public - State/Provincial

Renovation

8

12

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
258
Bidding Soon
3,882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

May 1, 2026

Project location map

11630 Wilson Rd, New Buffalo, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.