BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 4, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a sidewalk / parking lot in New Buffalo, Michigan. Completed plans call for site work for a sidewalk / parking lot.

New Buffalo Area Schools requests proposals from qualified contractors to furnish all labor, materials, equipment, and supervision necessary to complete improvements to the Transportation parking lot, including expansion, resurfacing, and associated site work. The objectives are to improve overall parking lot condition and durability, expand usable parking and traffic flow areas, provide a properly graded and compacted surface for long-term performance, and upgrade traffic control features to support operations at the Transportation facility. Scope of Work: - Site Preparation & Excavation: Excavate expansion and new construction areas to a depth of 9" below existing grade, remove three tree stumps, and verify field conditions prior to excavation. - Base Installation: Install 6" of 22A stabilized gravel in all new/expanded areas, fine grade entire project area, and compact all areas prior to paving. - Asphalt Work: Rotomill and remove existing asphalt to gravel base, furnish, install, and compact asphalt (3" average thickness of 4EL leveling course, 2" of 4EL wearing course). - Striping & Traffic Controls: Stripe parking lot per existing layout and install two new traffic loops at gates. Site conditions: Contractor must verify drainage, is not responsible for unmarked private utilities or irrigation, materials must meet MDOT Tier 2 specifications, and asphalt binder grades are specified. Instructions to Bidders: - Proposals must include company information, lump sum cost and breakdown, project schedule, materials and installation methods, proof of liability insurance, and clearly listed assumptions. - Contractors should demonstrate relevant experience, necessary insurance and licensing, and the ability to meet school site safety requirements. - Proposals will be evaluated based on cost, contractor experience and qualifications, schedule, and quality of materials and installation approach. - Contractors must coordinate work to minimize disruption, maintain a clean and safe worksite, and be responsible for utility locating prior to excavation.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
258
Bidding Soon
3,882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

July 1, 2026

Project location map

711 E Clay St, New Buffalo, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.