BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Site work and paving for a mixed-use development in New Buffalo, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Scope of Work The selected contractor will provide all materials, equipment, and labor required to complete the following: A. Pole and Fixture Installation O Supply seven (7) light poles that match the appearance, height, and finish of the existing LED light poles currently installed at the site. O Install fifteen (15) LED light fixtures on the new poles. O Include concrete pole bases for each of the seven poles as part of the installation. B. Exclusions O This scope does not include directional boring to poles that currently do not have conduit or bored piping in place. Please provide an alternate price for any directional boring needed. O This scope does not include removal of any existing poles currently owned by AEP (American Electric Power) or any other third-party utility provider. Please provide an alternate price for and removal. A site visit will be held upon appointment with the Mark German Director of Operations at the elementary school parking lot. Mark German Director of Operations mgerman@nbas.org 1112 East Clay St. New Buffalo, MI 49117 (269) 469-6017 Any questions regarding this RFP must be submitted in writing to parvanitis@nbas.org no later than May 29, 2025. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Scope of Work The successful contractor will provide all labor, materials, and equipment to complete the following: A. Surface Milling and Preparation o Mill the entire lot to a 1.5" depth (approx. 80,115 sq. ft.). o Mill designated red areas to an additional 2" depth (approx. 25,680 sq. ft.). o Compact the gravel base in red areas to prepare for paving. B. Paving o Install 2" base hot mix asphalt in red areas. o Apply a tack coat to the entire area to be resurfaced. o Pave the entire lot with 1.5" surface hot mix asphalt. C. Striping and Marking o Re-stripe and stencil the parking lot to match the existing layout using durable traffic paint. o Markings to include: o Approx. 3,900 linear feet of white striping o Approx. 850 linear feet of yellow striping o (21) arrows o (6) 'Visitor' stencils o (7) Handicap symbols o Note: Striping includes the east parking lot, which is not being repaved but requires restriping.

Award

Sidewalks / Parking Lot

$53,250.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
212
Bidding Soon
2,946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

July 1, 2025

Project location map

12291 Lubke Rd, New Buffalo, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.