Published October 20, 2026 at 8:00 PM

Updated November 2, 2026

Site work and new construction of a theater / auditorium in Pittston Twp, Pennsylvania. Completed plans call for the construction of a theater / auditorium; and for site work for a theater / auditorium.

Contract No. 1: General Construction Contract No. 2: Mechanical Construction Contract No. 3: Electrical Construction Contract No. 4: Plumbing and Fire Protection Construction Contract No. 5: Sitework Construction (Including Sheeting, Shoring and Soil Remediation) ll Bids Shall Remain Firm for Sixty (60) Days Following Opening of Bids. Each Contractor and Each Sub-Contractor Shall Be Licensed in the Community Where the Work Will Occur. The Contract Will Be Written to Retain 10% for Each Request for Payment. When the Contract Is 50% Completed, No Further Retainage Will Be Withheld, but No Retainage Previously Withheld Will Be Returned to the Contractor. All Retainage Withheld During the First 50% of the Work Will Be Held Until Completion. However, the Architect Must Approve the Application for Payment. Cut-Off Date for Issuing Bidding and Contract Documents Shall Be Monday, November 9, 2026 at 4:00 Pm. The Contractor Must Be Making Satisfactory Progress and There Must Be No Specific Cause for Greater Withholding. he Owner Also Reserves the Right to Reject Any and All Bids. A Bid Bond Made Payable to the City of Pittston Redevelopment Authority in the Amount of 10% of Each Base Bid Shall Accompany Each Bid, Executed by the Contractor and a Surety Company Licensed to Do Business in the Commonwealth of Pennsylvania, as a Guarantee That, If the Bid Is Accepted, the Bidder Shall Execute the Proposed Contract and Shall Furnish and Pay for a Performance and Payment Bond in the Amount of 100% of the Contract Price as Security for the Performance of the Contract and Payment of All Costs Thereof, Upon Execution of Contract. If, After Fifteen (15) Days the Bidder Shall Fail to Execute Said Contract and Bond, the Bid Bond Shall Be Forfeited to the Owner as Liquidated Damages. The Bid Bond of All Bidders, Except the Three Low Bidders, Will Be Returned Within Ten (10) Days After the Opening of the Bids. The Bid Bond of the Three Low Bidders for Each Prime Contract Will Be Returned Within Three Days After the Executed Contracts and Required Bonds Have Been Approved by the Owner.

GC Bidding

Theaters / Auditoriums

$70,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
406
Active Projects
168
Bidding Soon
2,278
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2026

January 18, 2027

Project location map

99 S Main St, Pittston Twp, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed