BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 21, 2026

Site work for an industrial development in Sikeston, Missouri. Completed plans call for site work for a industrial development.

The project involves the beautification of the Rose Parkway entrance at the Sikeston North Industrial Park. The objective is to create an appealing entrance for current occupants, visitors, and potential new businesses. Bids must cover all labor, freight, taxes, rental equipment, materials, with a not-to-exceed total. Work includes installing two large kidney-shaped berms on either side of the entrance, each approximately 44’ x 16’, with poured concrete borders, industrial-grade weed barriers, and specified plantings (feathered reed grass, spirea, St. John’s Wort, and drift roses). During planting, plants must receive Bio-Tone Starter Plus and Soil Moist Transplant as directed on packaging. Stone mulch is to be used in the berms with color selection part of the design plan. The area between the berms and the roadway is to be leveled, all ruts repaired, and re-seeded if necessary. Six large protective boulders must be installed at the entrance, color also to be included in the design plan. A 12-month guarantee is required for plants installed, including free replacement. All work is to be completed per the provided deliverables and specifications. Temporary hose bib for watering will be provided by the City of Sikeston. Refer questions to Marcie Lawson: marcie.lawson@sikeston.net; 573-471-2498

Post-Bid

Industrial

$30,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
53
Bidding Soon
663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

May 4, 2026

Project location map

Rose Pkwy, Sikeston, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.