BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a municipal facility in Eastman, Georgia. Completed plans call for site work for a municipal facility.

The CITY OF EASTMAN is requesting submittals from qualified General Contracting firms for the EASTMAN COMMUNITY SPLASHPAD PROJECT. If your firm is experienced in similar type and size recreational or aquatic projects, you are requested to submit your qualifications for consideration and an opportunity to submit a fee proposal for construction, and management service for the project. The Construction Management services shall include a Pre-construction Design Phase and a Construction Phase. The CM will provide comprehensive administration and management of all aspects of the construction of the project and will work in concert with the A/E/Landscape Architect towards the successful completion of the project on schedule, at or less than budgeted costs, meeting or exceeding standards stipulated by the construction documents, and in adherence with standards required by local authorities and other agencies having jurisdiction. The CM, either through in-house staff or outside consultant/contractors, will serve as a construction manager/contractor or provide all construction services and activities necessary for the design, construction, and occupancy of the project. The services described in this Request are representative of the services required but do not constitute a comprehensive specification. A comprehensive specification of the Scope of Services required is contained in the proposed Construction Management Agreement that, at the CM's request, may be obtained from the architect/landscape architect. The project will include the design and construction of a new public splashpad facility, including water features, non-recirculation systems, drainage, safety surfacing, and associated site improvements. Any questions in regard to this Request shall be submitted in writing to Hofstadter and Associates, Inc via email: chad@hofstadter.com. The design/construction team will maintain a high level of design, quality, and cost control. The design is anticipated to begin shortly, and the successful Construction Manager at Risk (CM) will come on board during the engineering design schematic phase. The design and construction of the project will be coordinated to permit construction to begin in May, 2026. Final contract documents will be available in April, 2026. All necessary permits shall be obtained and not the responsibility of the CM.

Post-Bid

Municipal

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
34
Bidding Soon
512
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 1, 2026

Project location map

To Be Determined, Eastman, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.