BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2026 at 8:00 PM

Updated April 5, 2026

Site work for a road / highway in Atwater, California. Completed plans call for site work for a road / highway.

The work generally consists of removing current striping/buttons and restriping roadways (excluding traffic signal intersections) on Juniper Avenue between First Street and Shaffer Road, Bellevue Road between Winton Way and Shaffer Road, and Atwater Boulevard between First Street and Shaffer Road. The project covers approximately 10,865 linear centerline feet of roadway. All roads included are to be striped to current Caltrans standard specifications. All materials and construction methods must conform to Caltrans Standard Specifications and all referenced material and performance standards for hot mix asphalt and other bid items intended for use in this application. Material delivery must meet recommended delivery standards and quality control regarding material temperature. The contractor is required to provide all labor, materials, equipment, tools, incidentals, permits, services, and construction necessary to complete the work. Request for interpretation must be submitted in writing to: Justin Vinson, City of Atwater, Public Works Department 470 Aviator Dr, Atwater, California 95301 Email: jvinson@atwater.org request an interpretation, in writing, by Wednesday, March 25, 2026, at 5:00 p.m.

Bid Results

Roads / Highways

$260,560.00

Public - City

Site Work

3

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
0
Bidding Soon
846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

May 4, 2026

Project location map

Multiple Locations, Atwater, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.