BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2026 at 8:00 PM

Updated May 21, 2026

Site work, paving and new construction of a mixed-use development in Salt Lake City, Utah. Completed plans call for the construction of a parking garage; for site work for a parking garage; road / highway; and for paving for a road / highway.

Reference Number 0000416538 Bid Intent Not Available MULTI-STAGE COMPETITION The University of Utah (U Facilities) intends to hire a Design/Build Team comprised of a general contractor supported by subcontractors and an architect with supporting technical consultants to design and construct the following project: CTM-South Campus Parking Garage, Below Grade Loading Dock, Circulation and Roadway Improvements UNIVERSITY PROJECT NO. 22972 The total project budget is $116M (inclusive of Base Bid - 1,560 Stall Parking Structure). Alternate #1 - Structural Podium/ Foundation Upgrades for future vertical mixed-use development built above the parking structure and loading dock. Alternate #2 - Below Grade Loading Dock. Alternate #3 - Circulation and Roadways Alternate #4 - Access to 500 So. This design/build project will deliver a below-grade parking structure of approximately 1560 stalls designed and constructed to serve as the structural podium/ foundation for future vertical mixed-use development built above. A bid bond in the amount of five percent (5%) of the bid amount, made payable to the University of Utah on the AIA Document A310 - 2010 Bid Bond, or equivalent, shall accompany the cost proposal emailed to PDCContracts@utah.edu during Stage II. Question Deadline 03/27/2026 at 3:00 PM MT Questions are submitted online Yes, For questions regarding this project, please contact the Project Manager Lori Kaczka, at 385-214-5840 or lori.kaczka@utah.edu. No others are to be contacted regarding this project. The University of Utah reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the University.

Post-Bid

Parking Garage

$116,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

19

9

21

6

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
124
Bidding Soon
1,354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

June 30, 2026

Project location map

1795 E South Campus Dr, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.