BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Salt Lake City, Utah. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and water / sewer project.

The work includes expanding and constructing a new rental car overflow storage area by recycling the existing pavement and base course through full depth reclamation (FDR) and installing asphalt millings to create a uniform overflow storage surface. The reclaimed material will be used to extend the storage area into the adjacent unpaved areas. The project includes demolition of existing fencing and installation of new interior fencing to create four separate rental car storage zones, followed by the installation of new perimeter fencing to secure the overall storage area. Additional work includes upsizing the existing onsite detention pond and installing a new outlet structure for storm water control. The project also includes electrical work including installation of new overhead light poles. A new section of water line and a fire hydrant will also be installed within the rental car overflow storage area. Questions Due Date: Mar 26th 2026, 5:00 PM MDT

Post-Bid

Transportation Terminals

$2,150,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

28

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
107
Bidding Soon
1,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

June 2, 2026

Project location map

3920 W Terminal Dr, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.