Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a sidewalk / parking lot in Duluth, Minnesota. Completed plans call for site work for a sidewalk / parking lot.
As of April 21, 2026 project was awarded to Hovland Inc, awarded amount is $371,774.52. This project involves municipal infrastructure restoration covering bituminous, brick, concrete, and pavement restoration and/or replacement at 45 sites citywide due to prior utility repairs. The work includes installation of new sidewalk and replacement of existing sidewalk along various city streets, required due to tree removals and sidewalk improvements for individual owners within city right-of-way at various locations. Additional work includes removal and installation of fencing at Arrowhead Road and Columbus Avenue, rail crossing restoration at Fremont Street, and adjustment of existing electrical hand holes and utility castings. Electronic bids are preferred, with paper bids permitted only by contacting the purchasing office. Email bids are not accepted. The City of Duluth reserves the right to reject any or all bids, split the award, or waive informalities, irregularities, or minor deviations from the specifications as deemed to be in the city's best interests. Price may not be the only consideration for bid award. Bids must remain firm for a minimum of 60 days. The project is subject to prevailing wage requirements as established by the Minnesota Department of Labor and Industry. This work consists repairing and resetting 2 pilaster caps on Bridge 3 of Seven Bridges Road. The bridges over Amity Creek are numbered from the bottom of the hill. The record drawing for Bridge 69671 has been included in the plan, and includes details of how the stainless steel dowels and the pilaster caps shall be set on all of the pilasters and railings. Bond Percentage 5.00% Questions regarding this project should be directed to: Cindy Voigt, City Engineer at 730-5071 or Paul Wictor, Senior Engineering Technician at 730-5085 (O) or 390-8431 (C). Every request for such interpretation should be submitted through Bid Express or via e-mail or postal mail to the Purchasing Division before the deadline indicated on the Invitation for Bids, or if no deadline is specified, at least five (5) days prior to the scheduled bid opening
Award
Sidewalks / Parking Lot
$371,775.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
May 1, 2026
Multiple Locations, Duluth, MN
Related To This Project
Duluth, MN
Bid Date: Apr 01 2026
Duluth, MN
Bid Date: Apr 23 2026
Duluth, MN
Bid Date: Apr 16 2026
Duluth, MN
Bid Date: Apr 15 2026
Duluth, MN
Bid Date: Apr 23 2026
Duluth, MN
Bid Date: Apr 28 2026
Duluth, MN
Bid Date: Apr 17 2026
Duluth, MN
Bid Date: Jun 02 2026
Duluth, MN
Bid Date: Mar 26 2026
Duluth, MN
Bid Date: Apr 13 2026
Duluth, MN
Bid Date: Apr 01 2026
Duluth, MN
Bid Date: Apr 20 2026
Duluth, MN
Bid Date: Apr 02 2026
Duluth, MN
Bid Date: Apr 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
