BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a sidewalk / parking lot in Duluth, Minnesota. Completed plans call for site work for a sidewalk / parking lot.

As of April 21, 2026 project was awarded to Hovland Inc, awarded amount is $371,774.52. This project involves municipal infrastructure restoration covering bituminous, brick, concrete, and pavement restoration and/or replacement at 45 sites citywide due to prior utility repairs. The work includes installation of new sidewalk and replacement of existing sidewalk along various city streets, required due to tree removals and sidewalk improvements for individual owners within city right-of-way at various locations. Additional work includes removal and installation of fencing at Arrowhead Road and Columbus Avenue, rail crossing restoration at Fremont Street, and adjustment of existing electrical hand holes and utility castings. Electronic bids are preferred, with paper bids permitted only by contacting the purchasing office. Email bids are not accepted. The City of Duluth reserves the right to reject any or all bids, split the award, or waive informalities, irregularities, or minor deviations from the specifications as deemed to be in the city's best interests. Price may not be the only consideration for bid award. Bids must remain firm for a minimum of 60 days. The project is subject to prevailing wage requirements as established by the Minnesota Department of Labor and Industry. This work consists repairing and resetting 2 pilaster caps on Bridge 3 of Seven Bridges Road. The bridges over Amity Creek are numbered from the bottom of the hill. The record drawing for Bridge 69671 has been included in the plan, and includes details of how the stainless steel dowels and the pilaster caps shall be set on all of the pilasters and railings. Bond Percentage 5.00% Questions regarding this project should be directed to: Cindy Voigt, City Engineer at 730-5071 or Paul Wictor, Senior Engineering Technician at 730-5085 (O) or 390-8431 (C). Every request for such interpretation should be submitted through Bid Express or via e-mail or postal mail to the Purchasing Division before the deadline indicated on the Invitation for Bids, or if no deadline is specified, at least five (5) days prior to the scheduled bid opening

Award

Sidewalks / Parking Lot

$371,775.00

Public - City

Site Work

19

5

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 1, 2026

Project location map

Multiple Locations, Duluth, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.