Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 27, 2026 at 8:00 PM
Updated May 28, 2026
Site work for a water / sewer project in Fremont, Nebraska. Completed plans call for site work for a water / sewer project.
Sealed bids are requested for all labor, equipment, and materials necessary to complete the installation of the Sanitary Collector Vault and Manhole Rehabilitation. Each bid must be accompanied by a certified check, cashier's check, bank draft from a Nebraska FDIC-insured bank, or a bid bond in an amount not less than 5% of the bid price. Bid security must be sealed, addressed to the City Clerk, and labeled accordingly. Bids not meeting these criteria will be returned unopened. The bid security shall ensure the bidder's good faith to enter into the contract at the bid price if accepted. Bids without bid security will not be considered. Bid security for successful bidders is returned upon contract signing, while for unsuccessful bidders, it is returned after bid rejection. The City reserves the right to accept the bid that will provide the best workmanship and materials, regardless of the lowest bid, and to reject any or all bids or waive informalities. The successful bidder must submit an acceptable Affirmative Action Statement and Program to the Mayor's Office within ten days of award notification, failure to do so will forfeit the bid bond. The contractor must provide a Performance Bond equal to 100% of the contract price, valid for two years past project completion. Question Deadline 03/25/2026 Every request for such interpretation should be made to Eric Fuhrmeister, (402) 727-2821, or mailed to the Department of Utilities at the address given in the Notice to Bidders, and to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids. The City of Fremont, NE is soliciting sealed proposals from qualified contractors to perform sewer structure lining services at multiple locations located on the southeast side of Fremont, NE.
Award
Water / Sewer
$396,904.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2026
May 1, 2026
Multiple Locations, Fremont, NE
Related To This Project
Reconstruct Parallel Taxiway (3,240 X 35), Taxiway B Extension And Electrical Improvements - 6090960
Fremont, NE
Bid Date: Apr 17 2026
Fremont, NE
Bid Date: Apr 17 2026
Fremont, NE
Bid Date: Apr 14 2026
Fremont, NE
Bid Date: May 12 2026
Fremont, NE
Bid Date: Apr 27 2026
Fremont, NE
Bid Date: May 22 2026
Fremont, NE
Bid Date: Jun 02 2026
Fremont, NE
Bid Date: Apr 28 2026
Fremont, NE
Bid Date: Apr 02 2026
Fremont, NE
Bid Date: Mar 18 2026
Fremont, NE
Bid Date: Feb 26 2026
Fremont, NE
Bid Date: Mar 16 2026
Fremont, NE
Bid Date: Feb 19 2026
Fremont, NE
Bid Date: Mar 03 2026
Fremont, NE
Bid Date: Mar 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
