BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Renovation of a municipal facility in Barnstable, Massachusetts. Completed plans call for the renovation of a municipal facility.

Barnstable County invites sealed bids for Barnstable County Superior Courthouse Exterior Restoration per Bid No. 8115. Certification by the Division of Capital Asset Management and Maintenance (DCAMM) is required for General/Prime Contractors in the category of: Historical Building Restoration and filed sub-bid trades for the categories of Masonry, Roofing, Metal Windows, and Painting. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 04/09/2026 at 5:00 PM ET Any clarification of requirements or requests for additional information by proposers must be made in writing online In general, the General Contractor shall supply all labor, equipment, temporary protection, tools, and appliances necessary for the proper completion of the work as required in the Specifications, in accordance with good construction practice, and as required by the materials manufacturer, as amended. Supply all necessary chutes, disposal facilities, transportation, and labor necessary to dispose of all demolished materials, dirt, and debris off-site in a legal dumping area. Each Contractor and sub-contractor shall obtain all permits necessary to transport and dispose of all materials, rubbish, and debris impacted by their scope of work. Provide and maintain temporary protection of all building components designated to remain or new components installed throughout the duration of construction. Supply all shoring and protection necessary to protect the building areas, building systems, and landscaped areas. Coordinate site and building access and the scheduling and completion of all Work with the Owner. While the building will be unoccupied during construction, the Owner anticipates periodic access to offices, storage, and basement file rooms will be required. The General Contractor shall provide a means of access and establish procedures for entry. Coordinate with the Owner for Owner access as requested. The Owner will relocate non-fixed furniture and equipment within 5-feet of window and door openings prior to construction. Protect existing interior space finishes, furnishings, and equipment stored within the building during construction.

Award

Municipal

$5,570,000.00

Public - County

Renovation

55

23

13

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
323
Bidding Soon
3,411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

July 20, 2026

Project location map

3195 Main St, Barnstable, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.